Laserfiche WebLink
`M <br /> N <br /> 'N <br /> WEED OIL TANK (REMOVED) SB-3 <br /> VENT UNE (REMOVED) <br /> I DISPENSER (REMOVED) <br /> FILL I <br /> r— <br /> sB- �f I s <br /> + <br /> I J. � <br /> w Awl <br /> BUILDING —————— Z MW-1(PROPOSED)//� PRODUCT SUPPLY PIPING (REMOVED) <br /> I / <br /> L-——_.—- <br /> TANK (REMOVED) <br /> 00 <br /> APPROX. LIMIT OF EXCAVATION <br /> WASTE DISPOSAL DRUMS <br /> 1 <br /> SB-4 <br /> CONCRETE PAD <br /> rr off if181 -IfRRfR <br /> ENGINEERING AND ENNRONMENfAL SEANCES <br /> STOCKTON UNIFIED SCHOOL DISTRICT <br /> I EGEN11 Z GROUNDWATER INVESTIGATION <br /> PROPOSED MONITORING WELL LOCATION a 8 7.5 PROPOSED LOCATION OF MW-1 <br /> SOIL BORING LOCATIONS SCALE ;W STAGG HIGH SCHOOL <br /> Date: HU Project No: Figure No: <br /> 1/98 00817 2 <br /> SFAGO <br />