My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROOKSIDE
>
0
>
2900 - Site Mitigation Program
>
PR0505263
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 9:00:30 AM
Creation date
2/12/2019 8:49:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505263
PE
2960
FACILITY_ID
FA0006671
FACILITY_NAME
RIPKIN PROPERTY
STREET_NUMBER
0
STREET_NAME
BROOKSIDE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
CURRENT_STATUS
01
SITE_LOCATION
BROOKSIDE RD
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEVI N Eā¢FRICKE <br /> (BTXE) distinction using modified EPA Method 8020. Inu addition, <br /> two soil samples will be aandyzefor for BTXETPH as gasolineusing modified EPA Method <br /> modified EPA Method 8015, <br /> 8020. <br /> Task 5: Data Evaluation and Report Preparation <br /> A report will be prepared summarizing the data and presenting the <br /> resulting interpretations, assessments and recommendations for <br /> additional investigations or alternative remedial actions, if <br /> deemed necessary. The report will include detailed descriptions <br /> of the methods used to collect and analyze data, and the <br /> technical rationale for the conclusions reached. <br /> The report will describe the types of geologic materials <br /> encountered, the occurrence, concentrations and distribution of <br /> petroleum hydrocarbons and related compounds in ground water, if <br /> any, and interpretations concerning hydrogeologic conditions at <br /> the Site. The report will also contain lithologic logs prepared <br /> during drilling activities, including well construction design, <br /> chemical analysis data and other documentation. <br /> Task 6: Project Management and Meetings <br /> Ms. Beth Gurney, R.E.A. and Senior Project Scientist, will be the <br /> Project Manager. As such, she will be the primary contact for <br /> the Client and will be responsible for all technical and <br /> administrative aspects of the project. Mr. Charles Pardini, <br /> Senior Staff Geologist, will assist with field work, data <br /> evaluation and report preparation. Mr. Thomas Johnson, R.G. and <br /> Vice President, and Ms. Carol Yamane, Senior Project <br /> Hydrogeologist, will provide overall review for the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.