Laserfiche WebLink
1 <br /> CERCO Analytical, Inc. <br /> 3942-A Valley Avenue, Pleasanton, CA 94566 (510) 462-2771 Fax (510) 462-2775 <br /> FINAL RESULTS <br /> Client: Smith-Emery Company Date Sampled: 13-Apr-2001 <br /> Client's Project No.: 2500-29248 Date Received: 25-Apr-200I <br /> Client's Project Name: Brookside Pumping Station Date of Report: 14-May-2001 <br /> Authorization: Signed Chain of Custody Matrix: Soil <br /> Resistivity <br /> Moisture Redox 100% Saturation Sulfide Chloride Sulfate <br /> Job/Sample No. Sample I.D. (%) (mv) pH (ohms-cm) (mglkg)* (mg/kg)* (mg/kg)* <br /> 0104180-001 B-2, S5 @ 25' 25.8 - 7.3 1,500 - N.D. N.D. . <br /> 0104180-002 B-2, Sl @ 1.5-2' - - 8.4 680 - 26 19 <br /> Method: ASTM D2216 ASTM D1498 ASTM D4972 ASTM G57 ASTM D4658M ASTM D4327 ASTM D4327 <br /> Detection Limit: - - - - 50 15 15 <br /> Date Analyzed: 9-May-2001 - 8-May-2000 7-May-2001 - 7-May-2001 7-May-2001 <br /> Resu Its Reported on Wet Weight Basis <br /> N.D.-None Detected <br /> Cheryl McMillen <br /> Laboratory Dirccit�r <br /> S�+Ia11ly_�VI►IC+�3_SUuuttal'}'-Alt tah+a at.+rc 4111:1M) cnnhrot parameter mcrc found lo he Avilhin cslablMIC11 Until% Page No. [ <br />