Laserfiche WebLink
Chain of Custody 2001-04-03 ' Date Shipped:0411812001 <br /> f <br /> �. From: To: <br /> STL ChromaLab (CL) Cerco Analytical-SUB CONTRACT ONLY <br /> ti„ 1220 Quarry Lane 3942 Valley Avenue, Suite A <br /> Pleasanton, CA 94566-4756 Pleasanton, CA 94566 <br /> Project Manager: Gary Cook Phone: (925)462-2771 <br /> L Phone: (925)484-1919 Ext:103 Fax: (925)462-2775 <br /> Fax: (925)484-1096 Contact: Cheri McMillen <br /> Email: gcook@chromalab.com Phone: (925)462-2771 <br /> CL Submission#: 2001-04-0346 Project#: 2500-29248 <br /> CL PO#: Project Name: Brookside Pump Station <br /> ClientSaniple ID CL <br /> Sampldd Matrix <br /> Analysis <br /> r `z. <br /> Method Due <br /> ` GW-1 002 041171200116:35 Water <br /> Subcontract-Coliform SM9221 B 0_"V-2001 17:00 <br /> s� **FECAL COLIFORM-ANALYZE OUT OF HOLDING TIME <br /> PLEASE INCLUDE QC WITH FAXED AND HARD-COPY RESULTS <br /> V <br /> L <br /> as <br /> RE QUISHE Y: 1. RELINQUISHED 2. RELINQUISHED BY: 3. <br /> ig ture Ti ignature Time Signature Time <br /> rinted Name Dae Printed Name Dafe Printed Name Date <br /> / <br /> Company Comp Company <br /> RECEIV BY: 1. REC IV Y 2. RECEIVED BY: 3. <br /> OSI' <br /> ature Time Signature 7Time Signature Time <br /> 1 <br /> rinte am D qde Prinn�� ate Printed Name Hate <br /> AllC parry Company T�=Lvpany <br /> ti r Page 1 of 1 <br />