Laserfiche WebLink
RECE1, \IED <br /> Escalon Canal Only Layout JAN 2 7 247 <br /> R <br /> 11 <br /> 25POIR5 EO <br /> V c # <br /> :q `I <br /> foe <br /> This is the layout forjust canal protection.The Blue Line is the Shot Screen and it is about 400 feet long.This would <br /> provide minimal pellet recovery and with the rapidly increasing cost of dirt mining I can't recommend this solution. <br /> The initial cost would be only$15,000 less but the loss of income is significant. <br /> Estimated Costs: <br /> Poles. 9 @ $700.00 $6,300 <br /> Pole Hardware 9 @ $250 $2,250 <br /> Cable 2,000 feet 3/8 messenger wire @ $.30 per foot $ 600 <br /> Fabric: About 1600 feet @ $18.00 per foot $28,800 <br /> Pole Install crew 2 days @ $2200 per day $4,400 <br /> Lift Rental one month $1,_000 <br /> Total $43,350 <br /> Budget$45,000 <br /> Shot on Tarp and Newman, 5 panel curtain. <br /> - a <br /> V. <br /> tib - \ <br />