My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0042729
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
25187
>
2200 - Hazardous Waste Program
>
CO0042729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 11:19:21 AM
Creation date
2/12/2019 9:13:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
RECORD_ID
CO0042729
PE
2200
FACILITY_NAME
ESCALON SPORTSMAN CLUB
STREET_NUMBER
25187
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
24710004
ENTERED_DATE
12/29/2016 12:00:00 AM
SITE_LOCATION
25195 E RIVER RD
RECEIVED_DATE
12/29/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\25187\CO0042729.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Escalon Sportsman's Club <br /> Proposed Shot Screen Layout <br /> Allowing Maximum Lead Recovery <br /> T <br /> N <br /> yam. <br /> A <br /> N <br /> =,r <br /> i <br /> The Red Lines are layout lines for estimating distances.The Green Line is the main screen and is sites about 110 yards <br /> from the 16 yard line.This is optimum distance.That portion is 300 feet long and should be 40 feet high,just like <br /> Newman's.The panels are 8' high so that is 5, panel runs The Blue portion totals about 180 feet but using the bank in <br /> place of the bottom panel requires only 4 panel run down with the bottom run being 8 feet off the ground and would <br /> permit rifle shooting under that portion.The benefit of this layout is that you will recapture virtually all you lead and <br /> can sell it for reloading. By placing tarps on the ground,the lead can be recovered daily/weekly/monthly for <br /> immediate cash flow. Our new, heavy,440 High Tensile panels should last about 250,000 pattern impacts for those <br /> panels taking 85%+of the pattern hits which are the second and third rows from the top.You should recover about 1 <br /> ounce of pellets for every target shot at. <br /> Cost estimates: <br /> Poles. 11 @ $400-$900 depending on sourcing,est.$700 $7,700 <br /> Pole Hardware.About$250 per pole $2,750 <br /> Cable 3,000 feet 3/8 messenger wire @ $.30 per foot $1,000 <br /> Fabric:About 2250 feet @ $18.00 per foot $40,500 <br /> Pole Install crew 2 days @ $2200 per day $4,400 <br /> Lift Rental one month 1 000 <br /> Total $57,350 <br /> Budget$60,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.