Laserfiche WebLink
1 <br /> GEJ-PHASE <br /> 1 � <br /> ENVIRONMENTAL <br /> 1 September 26, 2007 <br /> 1 GPE Project No.:480.2 <br /> Mr. Ted Swanson <br /> 1 Valley Water Treatment <br /> 6520 Crosswoods Circle <br /> 1 Citrus Heights, CA 95621 <br /> RE: Brine Pit Destruction and Background Groundwater Investigation <br /> 612 N. Buena Vista Avenue,Stockton CA <br /> 1 (APN No.: 135-080-03) <br /> Dear Swanson: <br /> ' This report describes work completed to fulfill a RWQCB directive to obtain additional <br /> information regarding background salt concentrations of the groundwater related the <br /> 1 remedial investigation of the brine pit on the subject site. <br /> The scope of work comprised the following: <br /> 1 <br /> • Destruction of the former brine pit <br /> ' • Excavation and removal of about 25 yards of salt-impacted soil, and <br /> • Installation of a soil boring and a groundwater monitoring well. <br /> ' We appreciate this opportunity to serve your environmental needs. <br /> 1 Respectfully submitted, <br /> Geo-Phase Environmental Inc. <br /> 1 Stephen M. Lankford, PG/REA <br /> President <br /> Enclosures <br /> ' CC:Harlin Knoll, SCDEH <br /> Don Brand <br /> Kathy Amaru, RWQCB <br /> 1 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0295 <br />