My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUENA VISTA
>
23900
>
2900 - Site Mitigation Program
>
PR0526855
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 9:54:53 AM
Creation date
2/12/2019 9:46:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526855
PE
2957
FACILITY_ID
FA0018187
FACILITY_NAME
COMANCHE DAM POWERHOUSE
STREET_NUMBER
23900
Direction
E
STREET_NAME
BUENA VISTA
STREET_TYPE
RD
City
CLEMENTS
Zip
95227
APN
02301001
CURRENT_STATUS
01
SITE_LOCATION
23900 E BUENA VISTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C A M B R I A To: Harlin Knowll <br /> Company: San Joaquin County <br /> Address: 304 East Weber Avenue, 3d Floor <br /> © Stockton, CA 95202 <br /> Phone: 209-468-3442 <br /> D <br /> From: Celina Hernandez FEB 0 5 2op <br /> Phone: (510) 420-3313 ENVIRONi1 ENT HEA TH <br /> Date: February 2, 2007 PERMIT/SERVICES <br /> T ra n s m i tta I Re: Application for BoringMells <br /> Dear Harlin: <br /> Please find enclosed the completed application for wells and soil borings for the installation of <br /> three, four-inch diameter monitoring wells, and one soil boring at the site Camanche Dam <br /> Powerhouse in Clements, California. The site is located on the north side of the Mokelumne <br /> River and the Fish Hatchery. Cambria's January 17, 2007 Soil Investigation and Background <br /> Groundwater Monitoring Well Installation Workplan was approved by the Regional Water <br /> Quality Control Board (RWQCB) in a letter dated January 30, 2007. Cambria submitted the <br /> February 2, 2007 Soil Investigation and Background Groundwater Monitoring Well Installation <br /> Workplan Addendum (Workplan Addendum)to address the issues outlined in the January 30,2007 <br /> RWQCB letter. <br /> The proposed boring and well locations (site plan) and well construction diagram are presented in <br /> the February 2,2007 Workplan Addendum. <br /> Currently, the work is scheduled the week of February 19, 2007. If you have any questions, <br /> please contact me at 510-420-3313 or via email at chemandez@cambria-env.com. <br /> Sre , <br /> Celina Hemandez <br /> Senior Staff Geologist <br /> Attachments: <br /> *Permit Application and check for$374.00 <br /> *Master File Record <br /> *RWQCB approval letter dated January 30, 2007 <br /> *January 17,2007 Soil Investigation and Background Groundwater Monitoring Well Installation <br /> Workplan <br /> *February 2, 2007 Soil Investigation and Background Groundwater Monitoring Well Installation <br /> Workplan Addendum <br /> Cambria Environmental Technology,Inc.5900 Hollis Street,Suite A, Emeryville,CA 94608 Tel(510)420-0700 Fax(510)420-9170 <br /> H:\EBMUD\Camanche Reservoir\Dam Powerhouse\Correspondence\trans Permit to County 020207.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.