Laserfiche WebLink
Soil Investigation and Background Groundwater Monitorinf*ell Installation Workplan <br /> January 17,2007 <br /> C A M B R I A <br /> CLOSING <br /> Please contact Mr. Brandon Wilken at(510)420-3355 with any questions or comments. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> AL 0 <br /> ® Celina Hernandez QptJSG ,�Cs <br /> Senior Staff Geologist <br /> m No. 7564 z <br /> Brandon S.Wilken, P.G. or CA�,��? <br /> Senior Project Geologist <br /> Figures: 1 -Vicinity Map <br /> 2- Site Plan with Proposed Monitoring Well Locations <br /> 3—Monitoring Well Construction <br /> Attachments: A—Regulatory Correspondence <br /> B—Standard Operating Procedures <br /> cc: Mr. Colin Moy,EBMUD, 375 11'Street,MS#704, Oakland,CA 94607-4240 <br /> Mr.Mike Huggins,San Joaquin County Environmental Health Department,304 East Weber <br /> Avenue, 3rd Floor, Stockton, CA 95201 <br /> HAEBMUD\Camanche Reservoir\Dam Powerhouse\Repotts\Workplan Jan 2007\Final CAPH Workplan Jan 2007.doc <br /> 9 <br />