My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUENA VISTA
>
612
>
3500 - Local Oversight Program
>
PR0544134
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 10:12:05 AM
Creation date
2/12/2019 9:51:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544134
PE
3528
FACILITY_ID
FA0015939
FACILITY_NAME
VALLEY WATER TREATMENT
STREET_NUMBER
612
Direction
N
STREET_NAME
BUENA VISTA
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
612 N BUENA VISTA
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i J <br /> 77 l <br /> a <br /> Site Chronology <br /> 612 Buena Vista, Stockton <br /> LOP: 1714 <br /> APN: 13508003 ' <br /> 02/20/87 On this date a 1,000 gallon gasoline underground storage tank (UST) was <br /> removed and soil samples were collected for analysis. . <br /> 9: <br /> 02/18/94 The date of the Environmental Health Department (EHD) letter informing the <br /> responsible party (RP) that due to the elevated detection limits for the soil <br /> samples collected and analyzed at the time of the UST removal the EHD would <br /> not provide a closure letter. <br /> 02/07/05 The date of an Environmental Assessment work plan for the former UST area <br /> and brine pit. <br /> 02/25/05 Three GeoProbe borings were completed this date, with probe B3 in the former <br /> UST area. <br /> 03/09/05 The date of the Soil Boring Installation Report that showed soil and groundwater <br /> contamination in samples from probe B3. <br /> 03/18/05 The date of the Unauthorized Release Report'and the Notification of Hazardous <br /> Waste Discharge filed by EHD. <br /> 04/27/05 The date the site was placed in the Local Oversight Program and a Notice of <br /> Responsibility was sent to the RP. <br /> 05/17/05 The date of an EHD letter requiring submittal of a work plan to define the extent <br /> of the contamination. <br /> 12/01/05 On this date four monitoring wells were installed and soil and ground water was <br /> collected for analysis. <br /> 03/14/06 The date of the Report on the Soil Boring :,and Monitoring Well installation <br /> describing the work performed in December 2005. <br /> 02/22/07 On this date EHD approved the work plan for additional GeoProbe borings in the <br /> area of MW1 to define 'the extent of soil and ground water gasoline <br /> contamination, destruction of MW1 and installation of MW1 R. <br /> 03/09/07 GeoProbe borings B4 through B8 were completed on this date. <br /> 03/22/07 The date of the Site Characterization Report describing the work completed in <br /> March 2007. <br /> 06/01/07 The date of the EHD letter approving the corrective action plan (CAP)for soil <br /> excavation and dewatering the excavation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.