My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUENA VISTA
>
612
>
3500 - Local Oversight Program
>
PR0544134
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 10:12:05 AM
Creation date
2/12/2019 9:51:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544134
PE
3528
FACILITY_ID
FA0015939
FACILITY_NAME
VALLEY WATER TREATMENT
STREET_NUMBER
612
Direction
N
STREET_NAME
BUENA VISTA
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
612 N BUENA VISTA
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTHDEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> J < Donna K. Heran, R.E.H.S. +1 Program Coordinators <br /> : Director 304 East Weber Avenue,Third FloorCarl Borgman, R.E.H.S. <br /> Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.T. <br /> Assistant Director Margaret Lagorio, R.E.H.S. <br /> Telephone: (209)468-3420 <br /> Robert McClellon,R.E.H.S. <br /> Fax: (209) 464-0138 7e€€Carruesco, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Kasey Foley, R.E.H.S, <br /> VALLEY WATER TREATMENT <br /> CIO TED SWANSON <br /> 6520 CROSSWOODS CIRCLE <br /> CITRUS HEIGHTS CA 95620 <br /> RE: 612 N. Buena Vista :a <br /> LOP SITE: 0001794 <br /> Stockton, Ca.-95203 <br /> r. <br /> WORK PIAN: SITE CHARACTERIZATION <br />' DATED: FEBRUARY 14,2007 <br /> PREPARED BY: GEOPHASE ENVIRONMENTAL <br /> APPROVED: <br /> DISAPPROVED: [�] <br /> ADDENDUM NEEDED: [ ] Submit mi_t by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN[H$S 25296.10 (c)(3)]: <br /> 1. To destroy one MW in source area prior to soil excavation. <br /> 2. To complete 3-4 geoprobes and 1-2 MWs near source area to further characterize the <br /> soil and groundwater contamination plume. <br /> 3. To analyze soil and water samples for TPH-gas and B�TEX. <br /> 4. To prepare and submit a report of findings to EHD fori`review. <br /> COMMENTS.AND CONDITIONS: <br /> 1. Geoprobe sampling should be complete by May 1,2007. <br /> 2. The report of finding should be submitted to EHD for review by July 9,2007. <br /> DATED a BY Q✓�-{�� ,�w 8'�� <br /> Harlin Knoll Senior REHS 209 468-3442 <br /> Cc: Donald Brand <br /> GeoPhase Environmental <br />
The URL can be used to link to this page
Your browser does not support the video tag.