Laserfiche WebLink
14'September 1998. <br /> AGE-NC.ProJect No. 98-0:440 <br />' ,'-Page 4 ; <br /> _ of g <br /> if detected by EPA Method 8020., r <br /> The"results of the soil,analyses.,are contained inTable'"1. s " <br /> 3.1:2: .•Equipment Decontamination <br /> The hollow stem augers were steam.cleaned'prior-to'each bore hole advancement:Sampling tools' <br /> and brass sleeves used for sample collection were'thoroughly washed with a solution of Alconox,' <br /> t and thoroughly rinsed with cleaii;tap water prior'to'each sampling run. Following drilling activities,i <br /> 'rinseate generated from•decoritai.A ing the.equipment-was placed in properlylabeled R.O.T.-model <br /> 17H 55-galIon-drums an&was stored on-site in an area lacking public access. <br />' 3.1'.3:1 Logging <br /> During drilling activities, sample duplicates were monitored for.the presence of organic 'vapor using <br /> • an or anic-va or,meter a ui ed with a photo-ionization detector (PID: Thermo Environmental'.' <br /> 580A, 10.0 eV,�cal ibrated to isobutylene) and were described on•boring lags using the Unified Soil <br /> "Classificatiori System(USCS). Boring logs are included as Appendix A. General lithology beneath <br />' the site in cross sectional view is depicted on Figures 3 and 4: <br />' .3.1.4. '.Monitoring Well Completion, <br /> , ,•'. '� �. � _ n <br /> Soil borings"MW-`1"ithrough.,MW-4 "were single-completed as,,ground water'monitorig wells <br /> utilizing 2-inch diameter, schedule 40,blank polyvinylcholoiide (PVC) casing and'2-inchdiameter. <br /> Screened PVC.casing (0.020-inchslot) ' <br /> Eac ' was installed b 'lacin! the PVC well'casing assembl through the hollow.stem of the <br /> h well y p g g Y� g , <br /> augers to the total depth'of the boring:'The augers were incrementally_raised as.#3 Lonestar Lapis, <br /> Luster sand (filter pack) was slowly poured down the annulus between the well-casing and the inner <br />' wall of the hollow stem au er."The filter ack.was, Laced ad'aceni'to the screened casing from the <br /> g P P J , <br /> bottom'of the�,boring to:a paint'approximately two,feet above the top of the screel. Fohwing .. <br />' placement of the filter pack, a surge block was"inserted'irito.the'PVC casing arid was ower• then_ .y <br /> raised(suiged),repeatedly,forapprokimately'10 minutes.'Thereafter,the'depth to:the,top of the filter <br /> pack was measur•ed and bentonite chips (annular seal)placed above the filter pack:and,hydrated with <br /> clean tap water.•The remaining annular space was.sealed with portland type•H.cement: As-built well ' <br /> " consiruction•diagrams'are included as Figuies,5 through 8. <br /> i Advanced GeoEn'vironmental,Inc. <br />