My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BP-1100404
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TOSTE
>
25807
>
4200/4300 - Liquid Waste/Water Well Permits
>
BP-1100404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 11:14:09 AM
Creation date
12/2/2017 1:25:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
BP-1100404
STREET_NUMBER
25807
Direction
N
STREET_NAME
TOSTE
STREET_TYPE
LN
City
ACAMPO
Zip
95220
APN
00714026
SITE_LOCATION
25807 N TOSTE LN
RECEIVED_DATE
10/13/2009
P_LOCATION
JERRY SPORLEDER
P_DISTRICT
004
Supplemental fields
FilePath
\MIGRATIONS\T\TOSTE\25807\BP-1100404.PDF
QuestysFileName
BP-1100404
QuestysRecordID
1948825
QuestysRecordType
12
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUgu5t S,200S <br />OA Project Number:EOS09SA <br />6.0 PERCOLATION TEST INFORMATION <br />6.1 Percolation Test Locations <br />A site map indicating the locations of the percolation test holes is included as Plate 1 in the appendix <br />of this report. <br />6.2 Number of Percolation Tests <br />One shallow and one deep percolation tests were conducted on Parcels 7,8,9,10 and 11. <br />6.3 Boring Preparation and Presaturation <br />A total of five shallow and five deep soil borings were advanced on the Site.The deep and shallow <br />soil borings were drilled with a truck-mounted deep rock augur rig on July 29 and 30,2005. <br />A 1.S-inch diameter PVC pipe with perforations on the bottom was used to measure the drop of <br />water in the percolation test boring.Approximately 2 inches of "pea gravel"were placed in the <br />bottom of the open soil boring,then the PVC pipe was installed on top of the gravel."Pea Gravel" <br />was then used to backfill in the annular space. <br />Presaturation of the percolation test holes occurred on August 1,2005.111e depth of water used to <br />pre-soak was 12 inches above the bottom of the borings. <br />6.4 Condition of Borings After Presaturation <br />After the 24-hour soak period,the presaturated holes were found to be intact on the day of testing. <br />All five of the deep percolation test holes were dry,while the shallow test holes contained water on <br />the bottom. <br />6.5 Percolation Test Procedure <br />Percolation tests were conducted for the borings on August 2,2005 in accordance with the <br />requirements of the EHD.A percolation test with a duration of four hours was performed for each <br />bole.The last half an hour was observed by Ms.Lisa Medina,Senior Registered Environmental <br />Health Inspector,EHD. <br />8
The URL can be used to link to this page
Your browser does not support the video tag.