My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1016
>
2200 - Hazardous Waste Program
>
PR0514000
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2024 2:27:45 PM
Creation date
2/13/2019 11:14:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514000
PE
2227
FACILITY_ID
FA0009712
FACILITY_NAME
LKQ ACME TRUCK PARTS
STREET_NUMBER
1016
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15511001
CURRENT_STATUS
01
SITE_LOCATION
1016 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0514000_1016 S WILSON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELAZARDOUS WASTE CONTINGENCY PLAN <br />For, use by Unidocs Member Agencies or whom approved by. your Local Jurisdiction <br />Authority Cited: Mle22, California Code: of Regulations:(CCR) §6626152 as referenced by,, 66262.34(a)(4) or 6x4S0.3(c)(9)(C) <br />Faeilities that generate 1,000 kilograms or more of hazardous waste per month, oraccumulate more than 6,000 <br />kilograms of hazardous wasteon-site at any one time, must prepare as Contingency Plan. Facilities thatgenerate <br />. <br />in any month more than Ildlograin of acutelyhazardous waste (AHW,), or r ore, than 100 kilograms of debris <br />_. ardous n <br />resulting from the spill of an ARW, or. Which treat Hazardous waste. onsiO under the Permit by RWe -(PDP,) <br />onsite treatment tier must also prepare a Contingency Plan., Many facilities that are required to: prepare a <br />WB reporting Contingency Plan, ar 41s Business Plan P requirements <br />pe, already subject to Hazardous Mated )P) rep <br />This site-specific Contingency Plan is the facility's plan -for dealingwith emergencies and shall be implemented <br />immediately whenever there is, an imminent or actual fire, e4losion, or release of hazardous,waste: or a <br />hazardous waste constituent which could threaten human health .and/br the environment. At -least one copy, of <br />the: plan shall be maintained, at the facility, for: use In the event of an emergency and for inspection by the <br />local agency. A copy of the, plan and any revisions must be: pro I vided to any Y contractor, hospital, or agency <br />with w9om. special (i.e. contractual) emergency services armigpments have been made (see SeeW:* :E, below), <br />A. Facility Information: <br />BU81213SS NANtE LK Q ACME TRUCK PARTS.. BUSMMPHONE. <br />1(20 q <br />SUE ADDRESS crff! ZIPCODE <br />12. 2Z�S, <br />tp!i2 = <br />B. Emergency Coordinators: <br />All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note: <br />Emergency doordinator responsibilitiesI are described in Section F,, below.) If more than two people are <br />qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers,of the additional <br />qualified individuals on an attached page in the order in which they will -assume responsibility as, alternates, <br />then check. the box beneath the: Emergency Coordinator. information -table, below, and indicate the list's page <br />number in the space provided. <br />PrImag. Ener en Coordinator <br />Secondam Enimem Coordinator <br />NAME <br />=E n <br />BUSINESarnuNE <br />NAME <br />FITI E <br />th/4vv <br />BUSINESS PHONE <br />24-HOUR PHONE. <br />1,5B I <br />2a -HOU PRONE <br />c�q - <br />PAGER '# <br />PAGER# <br />El (Check box only i(applicable) :Additional Emergency Coordinators are listed on page of this plan. <br />C. Evacuation Plan: <br />1. The following alarm signal(s) will be used to begin evacuation of the Theilit(check all <br />that apply); <br />X <br />- Bells; -Horns/Sirens; 5rVerbal (i.e., shouting); YOther (Vpeci& <br />k <br />UN -017 -1/6 <br />www.uniddes.org <br />Rev. 03127/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.