1 <br /> Water was encountered during excavation and stabilized at a?depth of 6 feet. One water <br /> (grab) sample was collected from the excavation and analyzed for TPH as gasoline and <br /> BTE&X. <br /> i <br /> 3.2 Stockpiled Soil Sampling <br /> a <br /> Soil from the excavation was stockpiled in three piles near toe rear of the property. One <br /> sample was collected from each stockpile. The samples were transported to AAL and <br /> analyzed for TPH as gasoline and BTE&X. The sample locations are shmn on Figure 3. <br /> 3.3 Bloremediation or Stockpiled Soil <br /> On May 1.7, 1994,the stockpiled soil was inoculated with a bacteria medium to promote the <br /> degradation of petroleum hydrocarbons. Approximately 250 gallons of inocubmt were <br /> sprayed over the sail piles.The inoculation was performed by r.Jim Hoeltgen,GeoAudifs <br /> consulting microbiologist. After inoculation was completed, the piles were covered with <br /> plastic sheeting. Stockpile SPI was later separated into stock0iles SPI and SP4. <br /> 4 <br /> 3.4 Bioremediation M[ooitoring <br /> k <br /> l <br /> Bioremediation progress was monitored by collecting soil samples from the inoculated soil.. <br /> Four sets of oonf'irmatory samples were collected from the Heated so al between June and <br /> December 1994. Two samples were collected from each sto pile and composited at the <br /> laboratory for analysis during each sampling event.The sampls were then and transported <br /> to McCampbell Analytical Inc. (MAI)in Pacheco, California ir analysis. Stockpile sample <br /> locations for June and August 1994 are shown on Figure 4. ample locations for October <br /> and December 1994 are shown on Figure 5. <br /> 3.5 Excavation Backfilling Procedures <br /> With the approval of the PHSIEHD, stockpiles SP-3 ands SP-4 were returned to the <br /> excavation on September 16, 1994.Additional soil was removod from beneath stockpile SP- <br /> 4, and clean soil was imported to bring the excavation to surfa grade.A layer of road base <br /> was then placed over the backfill material to farm a gravel su ce.The hole created on-site <br /> from the excavation of additional backfill material was lined with plastic,and stockpile SP-1 <br /> was moved to this location. <br /> 3.6 Drilling and Sampling <br /> On October 18, 1994,three soil borings were drilled at the si � . Borings MW-1, MW-2 and <br /> MW-3 were advanced to depths of 20 feet and completed as 0oundwater monitoring wells. <br /> .Auger returns were placed on plastic sheeting and stoned on-bite. The boring locations are <br /> depicted in Figure 5. <br /> F <br /> CnnkMa�Aodt8cniq]aa b <br /> bV1�QtAw.✓1Ri1lS <br /> 4l <br /> I <br /> ti <br /> } <br />