My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2003 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:40:16 PM
Creation date
2/13/2019 2:56:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2009
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLLD protects your inves'Lment while <br /> helping maXl m ize fuel sales and Margin. <br /> How PLLD <br /> More Than Pays For Itself <br /> For a store with existing conduit, or one <br /> that's raising and rebuilding their site, a ' <br /> $3,000 - $5,000 investment in PLLD (in- Reach,Peak SI V, C <br /> cluding installation)provides the following <br /> benefits: <br /> •Increased flow rates Veeder-Root PLLD Payback/ NPV analysis vs. Mechanical Line <br /> •Elimination of the recurring costs of Leak Detection <br /> using mechanical line leak detectors <br /> Year 1 Year 2 Year 3 Year 4 Year 5 Total <br /> • Continual protection for your site COST <br /> Investment Avg.Total Cost <br /> (Including Installation) S(4,000) S — S — S — S — $(4,000) <br /> BENEFIT <br /> Replacement of Mechanical <br /> Line Leak Detectors 900 — 900 — — 1,800 <br /> Avg.Annual Line <br /> Testing Cost 300 300 300 300 300 1,500 <br /> Avg.Annual Mechanical <br /> Testing Cost 220 220 220 220 220 1,100 <br /> Avg.Margin Gain through <br /> Increased Flow 1,100 1,100 1,100 1,100 1,100 5,500 <br /> Net Margin Impact $(1,480) $1,620 $2,520 $1,620 $1,620 $5,900 <br /> 'NPV........ $5,877 <br /> Assumes a hurdle rate of or weighted avg.cost of capital of 15% <br /> With a payback of less than 2 years , the cost of <br /> providingcontinual protection for your sites <br /> pays for itself. <br /> For more information call <br /> 1-888-561-7942 <br /> VEEDER-ROOT 2003 Veeder-Root Company • 125 Powder Forest Drive • Simsbury,CT 06070 • USA <br /> Telephone:860-651-2700 • Fax:860-651-2719 • www.veeder.com <br /> VR 13759 P/N 0576047-071 RevA VRLP 1/2003 Printed in USA <br />
The URL can be used to link to this page
Your browser does not support the video tag.