Laserfiche WebLink
S'6VRCB,January 2002 Page L� off <br /> I SECONDARY PIPE TESTING <br /> Test Method Developed By: XTiping Manufacturer U Industry Standard U Professional Eo&eer <br /> U'Other(Specify) <br /> Test Method Used: essure U Vacuum U Hydrostatic <br /> Other(Specify) <br /> Test Equipment used. P(�exµ/2 Cu 2,f a,� p s L Equipment Resolution: ' I& <br /> Piping Run#5 Piping Rua# Piping Run# Piping Run# <br /> lPipin"71-2.;' <br /> / <br /> Piping <br /> g Diameter: r <br /> Length of Piping Run:. �} ,)Yu X . Z G o 1 / <br /> Produci Stored: r 2 l <br /> Method and location of-PTmg / <br /> _run isolation: <br /> Wailtim4etwecn applying <br /> p acuum/water and <br /> s test: o u V <br /> Test Start Time: <br /> Initial Reading(RO: <br /> Test End Time: <br /> Final Reading(RF): P 5 <br /> Test Duration: 0 u✓ l r <br /> Change in Reading(RP-Rj: 19 9 <br /> Pass/Fail Threshold or <br /> Criteria: N o Lo s s«r P s <br /> f: f f . .,,t l <br /> COII]131 CIIt3—(include information on repays made prior to tenting:and recontmen,*J olloxx-t�for failed <br />