Laserfiche WebLink
Site Address X6100:25775 S PATTERSC ASS,TRACY,CA 95376 i D f T a stinWServicing: <br /> F.' In-Tank Gauging I SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> CheckCheck <br /> this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the follow' checklist: <br /> Ye" 21 <br /> Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No* Was accuracy of system product level readings tested? <br /> Yes No* Was accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe kow and when these deficiencies were or will be corrected. <br /> C. Line Leak Detectors (LLD): Lj Check this box if LLDs are not installed. <br /> Complate tke following ckeeklist: <br /> Yes No* For equipment startup or annual equipment c cats was a leak simulated to verify LLD performance? <br /> NIA (Check all that apply) Simulated leak rate: g.ph.1; 1 0.1 g.ph.2; M 02 g.p h.2 <br /> Notes: 1. Required for equipment sWt.up certificationMW annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Ps No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No* Was the testing apparatus properly calibrated? <br /> Yes N FormechanicalLLDs,does the LLDrestrict product flow ifitdetects aleak? <br /> IA <br /> as No* For electronic LLDs,does the turbine'automatically shut off if the LLD detects a leak? <br /> NIA <br /> O"Yes No* For electronic LLD s, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> NIA or disconnected? <br /> Yes No* For electronic LLDs, does the turbine automatically shut off if anyportion of the monitoring system malfunctions <br /> NIA or fails a test? <br /> es No* For electronic LLDs,have all accessil l,e wiring connections been visually inspected? <br /> ZI NIA <br /> alyes 11, No* Were all items on the equipment mat:ufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe kow and wken tkese,deficiencies were or will be corrected. <br /> M Comments: <br /> I 7 � <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I E <br /> L - � <br /> I <br /> t <br /> • t <br /> . I <br /> i I <br /> Page 3 of 3 03r81 <br />