My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2003 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:40:16 PM
Creation date
2/13/2019 2:56:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2009
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address X6100:25775 S PATTERSC ASS,TRACY,CA 95376 i D f T a stinWServicing: <br /> F.' In-Tank Gauging I SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> CheckCheck <br /> this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the follow' checklist: <br /> Ye" 21 <br /> Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No* Was accuracy of system product level readings tested? <br /> Yes No* Was accuracy of system water level readings tested? <br /> Yes No* Were all probes reinstalled properly? <br /> Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe kow and when these deficiencies were or will be corrected. <br /> C. Line Leak Detectors (LLD): Lj Check this box if LLDs are not installed. <br /> Complate tke following ckeeklist: <br /> Yes No* For equipment startup or annual equipment c cats was a leak simulated to verify LLD performance? <br /> NIA (Check all that apply) Simulated leak rate: g.ph.1; 1 0.1 g.ph.2; M 02 g.p h.2 <br /> Notes: 1. Required for equipment sWt.up certificationMW annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Ps No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No* Was the testing apparatus properly calibrated? <br /> Yes N FormechanicalLLDs,does the LLDrestrict product flow ifitdetects aleak? <br /> IA <br /> as No* For electronic LLDs,does the turbine'automatically shut off if the LLD detects a leak? <br /> NIA <br /> O"Yes No* For electronic LLD s, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> NIA or disconnected? <br /> Yes No* For electronic LLDs, does the turbine automatically shut off if anyportion of the monitoring system malfunctions <br /> NIA or fails a test? <br /> es No* For electronic LLDs,have all accessil l,e wiring connections been visually inspected? <br /> ZI NIA <br /> alyes 11, No* Were all items on the equipment mat:ufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe kow and wken tkese,deficiencies were or will be corrected. <br /> M Comments: <br /> I 7 � <br /> I <br /> I <br /> 1 <br /> 1 <br /> I <br /> I E <br /> L - � <br /> I <br /> t <br /> • t <br /> . I <br /> i I <br /> Page 3 of 3 03r81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.