Laserfiche WebLink
CONTRACTOR: SITE ADDRESS: <br /> TLM PETRO LABOR FORCE, INC. ARCO • 6100 <br /> 9165 BAYSINGER STREET 25775 S PATTERSON PASS RD <br /> DOWNEY, CA 90241 TRACY, CA <br /> CA. LIC. • 761755 CLASS A HAZ. <br /> - — - I <br /> Figure A-9 <br /> Figure A-2 Typical Product Side Installation Using Phil-Tite System <br /> Typical Vapor Recovery Side Installation Using Phil-Tice System j <br /> pill Container Lid with <br /> j Dust Ca Special U Shape Viton Gasket <br /> Spill Container Lid with <br /> Special U Shape Viton hil-TiteAdapter SWF-1006-Brass <br /> Dust Cap ..�,- <br /> .�.�,,."Cast in concrete or attached <br /> Phil-Tile Adaptor SWV-101 B-Bras& 4 7" min. to a steel diamond plate cover/lid <br /> 4 7116"min. '%,,,_Cast in Concrete or attached "O"Ring-Large Buna-N Seal <br /> to steel diamond plate coverilid --- <br /> "O"Ring- Large Buna-N Seal Stainless Steel Sleeve hil rite Spill Container-Nylon P6 <br /> 1.Achieves 5 gallon capacity. <br /> Stainless Steel Sleeve 2.Allows for remove!or installation 114"Flat Seal-Pellethane <br /> 1.Achieves 5 gallon capacity. 1/4"Fiat Seal-Pellethane of the spit!bucket without breaking <br /> j 2. Allows for removal or installation concrete or lid disassembly. rain hales(path)into(through)drop tube <br /> li of the spill bucket without breaking. Phil-Tite Spill Container-Nylon P6 ° <br /> concrete or hid disassembly.. j <br /> 114"Flat Seal-Pellethane <br /> Phil-Tile Drop Tube Seal <br /> 114"Flet Seat-Pellethane Phil-Tite Riser Adaptor MIF4X4 <br /> J <br /> Achieves square,flat sealing.surface <br /> Phil-Tfle Riser Adaptor Mi-Male Threads are Straight e !. <br /> !, 9 Female Threads are NPT-Achieves square cut,flat sealing <br /> jl Threaded Tank Riser 1 1 ) <br /> Threaded tank riser{ ) <br /> Tank Bung <br /> IThreaded Fitting w/Extractor <br /> j Tank Bung <br /> - - — Phil-Tite 61-SO-PT Overfilf Prevention Device <br /> �B' or 10'(OPTIONAL) <br /> Bleed Hole c <br /> Ball Float Vent Valve(OPTIONAL) <br /> I.Sized to actuate at 90%n tank capacity ', Bottom of drop <br /> or 30 minutes prior to tank overfill. Drop tube opening tube should be <br /> 2.Appropriate Isizin ma be based on SWftC6 must be.submerged_ cut on 45 degree <br /> 9 Y when liquid level is an le <br /> requirements and manufacturers specifications. 6"dee g <br /> p <br /> �S <br /> J <br /> J <br /> CJ <br /> v SCOPE OF WORK <br /> � THE WORK, IN GENERAL, IS THE REPAIR, REPLACEMENT AND ADJUSTMENT OF COMPONENTS OF THE EXISTING <br /> ENHANCED VAPOR RECOVERY SYSTEM INCLUDING THE FOLLOWING: <br /> ;,LJiQ REPLACE 4" STEEL RISERS AS NEEDED TO ADJUST FOR PROPER HEIGHT. <br /> O2 PROVIDE TESTING AND INSPECTIONS AS REQUIRED. <br /> Z <br /> ¢I <br /> U <br /> Z <br /> I— <br /> H <br /> W <br /> (n Call Toll Free <br /> 1(800)227-2600 <br /> TWO <br /> WORKING DAYS <br /> BEFORE YOU <br /> DIG <br /> -T REVISIONS DRAWING RELEASE APPROVAL /� EVR DETAILS SCALE: AS NOTED SHEET <br /> N0. DATE DESCRIPTION N0. DATE DESCRIPTIONTLM PETRO LABOR FORCE, INC. DRAWN BY: <br /> j a SITE: DATE: 01-04-06 <br /> 9165 BAYSINGER ST. OFFICE: 310-639-2227 ARCO • 6100 JOB No. TLM-36 <br /> Q DowNEY, CA 9oz41 FAX: 310-639-2229 25775 S PATTERSON PASS RD of <br /> TRACY, CA DRAW NG: 6100-EVR <br /> CHECKED BY: <br /> U <br />