Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN — (Page 2 of 2) <br /> (Chell <br /> VI. UNDER DISPENSER CONTAINMENT(UDC) MONITORING thhatatapply) <br /> pl1 y)) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.FIJ:CTRONIC STAND-ALONE 490'54& <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER: V r S D P_9— — 00—r 490.55. MODEL#: T L S — 3 S O 490 <br /> LEAK SENSOR MANUFACTURER: V fE F-Di=P, IZ po—r a90-37- MODEL ti(S): _7943$C — ZC 9 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. 13 a.YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ta a.YES ❑ b.NO 490'60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 4901 <br /> UDC MONITORING STOPS'THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑ b.NO 490.62 <br /> UDC CONSTRUCTION IS: 1.SINGLE-WALI. ❑ 2.DOUBLE WALL 441-63 <br /> IF DOUBLE WALL: 490-64& <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490.64" <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65 <br /> MUST BE PERFORMED. PERIODIC F.LD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 ccit§2644.q <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE.*msni)EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490'67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490.68. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.E UIPMFNT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities arc familiar with all of the following documents relevant to their job duties: 490.64& <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-&k- <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49a-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.690 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49t1.69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69y. <br /> C1OTHER(Specify): 490.660' <br /> 490.69&. <br /> This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council 490.70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> • The facility employee's role with regard to the monitoring(quipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> • Names)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br /> SE tQi >nf I)Y- i461er /lltdiblc & Viskal fie 1>~al AItYw. - Pry ,1QIM*,1J C D 0/0 ov" S I p qYw• <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investiated;ander all monitoring records arc_maintained properly_ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: G( R PA �L- 490.72 TITLE: -TR E A S WLF►L 490-71 <br /> NAME: 490-74 'TI17LE: 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE JDATE: 490-77 <br /> G Ya i � Fl�� I Z6QS" <br /> REPRESEVM'G 0 1 Tank Owner or M2 Fadlity Owen a 3.Authorized Repantrive dOwoer 490.76. <br /> APPLICANT NAME(print): 490.79 APPLICAN'r TITLE: 490.79. <br /> GI (ZA P a T i_L_ ? RpRS UR(t2 <br /> UPCF UST-D(12/2007)-3/4 www.unidoes.org <br />