My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS SOIL AND GROUNDWATER INVESTIGATION REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BYRON
>
0
>
2900 - Site Mitigation Program
>
PR0521880
>
ARCHIVED REPORTS SOIL AND GROUNDWATER INVESTIGATION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2020 2:53:46 AM
Creation date
2/14/2019 9:01:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SOIL AND GROUNDWATER INVESTIGATION REPORT
RECORD_ID
PR0521880
PE
2960
FACILITY_ID
FA0014864
FACILITY_NAME
TRACY-BYRON RD - TBR
STREET_NUMBER
0
STREET_NAME
BYRON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
BYRON RD
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Byron Road Project - 2 - 19 April 20 <br /> ' Tracy, San Joaquin Co. <br /> RECOMMENDATIONS <br /> Based on review of the previous and current findings discussed in the attached memorandum, we concur <br /> that additional borings are needed for delineating impacts to soil and groundwater. We have the <br /> ' following general recommendations regarding placement of proposed additional borings: <br /> • One boring south of and midway between SB-2 and SB-3; <br /> ' One boring south of SB-6; <br /> • Two borings - diagonally southwest and southeast of SB-8; <br /> • One boring south and midway between SB-11 and SB-12; <br /> ' • One boring south of SB-19; <br /> • One boring south of SB-23; <br /> • One boring south of SB-25 (Caldrons Store property); and, <br /> ' • One to two borings southeast of SB-33 within the area occupied by a storm water basin. <br /> By 15 July 2004 please provide a plan and time schedule for delineating the extent of soil and <br /> groundwater impacts as described above. <br /> ' If you have any questions or comments,please contact Dean Hubbard at(559) 445-5179. <br /> SHELTON R. GRAY C C. DEAN HUBBARD <br /> Senior Engineering Geologist Engineering Geologist <br /> RG No. 6357 149 <br /> ' cc: Michael Infuma, Jr., San Joaquin County EHD, Stockton <br /> Luis Mercado, SAIC, SacramenYe-k <br /> ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.