Laserfiche WebLink
r West Byron Road Project -4- 15 April 206d <br /> Tracy, San Joaquin Co, <br /> ' • One boring south of SB-19; <br /> • One boring south of SB-23; <br /> • One boring south of SB-25 (Caldrons Store property); and, <br /> • One to two borings southeast of SB-33 within the area occupied by a storm water basin. <br /> 1: <br /> During the next investigative phase of borings, consideration should be given to collecting samples from <br /> appropriate depths for conducting an evaluation of the human health risk assessment. <br /> r <br /> r <br /> r <br /> i <br /> r <br /> r <br /> .r <br /> r <br /> r <br /> r <br />