Laserfiche WebLink
f°Li( <br /> .x <br /> i <br /> �. <br /> t„!W—i � <br /> MW-3 <br /> MW-1�" i <br /> { I <br /> APN 238-040-02 MW-4 _ <br /> City water line—✓� 0 <br /> 0 <br /> 0 <br /> 4 4 ' <br /> + I <br /> EXPLANATION <br /> 1 <br /> = Approximate location of monitoring wells installed <br /> by Levine•Fricke 1 <br /> Southern Pacific Railroad }I <br /> -- Approximate location of existing and former pipeline <br /> right—of--ways owned by others I4 <br /> _ ,; Approximate°location of Chevron Pipe Liner's former ° <br /> [ Wait-Mendota—Richmond pipeline right—of—way <br /> r - —N— <br /> ` t i 0 145 ft. <br /> NOTE.-Bose mop and assessment locations adapted from Figure 2 <br /> x <br /> of Levine-Fricke 27 July 1990 'Report on Ground-Water . �Y. Approximate <br /> Quality;-investigations. Sunboro Development Corporation, Scale <br /> Porce! B." �- Cft" n\W9-os' 09/04/96�� <br /> Reviewed'by: SITE PLAN Project No. <br /> HIGHIET/MONTEROSSO PARCEL C3499 <br /> Tracy, California <br /> J Chevron Pipe Line Company <br /> Approved by: Figure <br /> GEOMATRIX CONSULTANTS, INC. { <br /> Engineers. Geologists, and Environmental Scientists 2 <br />