Laserfiche WebLink
J <br /> TIM <br /> Civic Center Square <br /> 2444 Main Street, Suite 215 <br /> Fresno, California 93721-2734 xGd <br /> [209]284-2535 • FAX[209] 264-7431 ;.;. L. . GEOMATRIX <br /> .:-�'�-+��,{'. <br /> 19 April 1996 :; `�%' " r2 <br /> =; j <br /> - <br /> Project C3499 <br /> Ms. Margaret Lagorio <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> Post Office Box 2009 <br /> Stockton, California 95201 <br /> Subject: Monterosso,McCormack, and Nicholaw Parc is <br /> West Byron Road. <br /> Tracy, California <br /> Dear Ms. Lagorio: <br /> Geomatrix Consultants, Inc. (Geomatrix) is performing work on behalf of Chevron Pipe Line Company <br /> (CPL) at three parcels located on West Byron Road in the City of Tracy. The parcels are referred to as <br /> Monterosso (APN 238-040-02), McCormack (APN 238-040-01), and Nicholaw (APN 238-080-02). <br /> Results of previous assessments at these parcels indicate the presence of petroleum hydrocarbon con- <br /> stituents.in soil, possibly as a result of.releases from the nearby pipeline previously operated by CPL. <br /> At this time, the available data suggest that groundwater iis not been impacted at these sites. Certain <br /> parcels are scheduled to be developed for'residential"use in the near future. The owners of these parcels <br /> believe that development may be delayed due to the prese ce of petroleum hydrocarbons in the subsur- <br /> face, as the City of Tracy may require approval from regulatory agencies prior to issuing permits for <br /> development. CPL has entered into agreement with the property owners to work with the appropriate <br /> agencies to obtain closure at these sites thereby simplifying the permitting process for development. <br /> CPL would like San Joaquin County Environmental Health Division's (SJCEHD'S) concurrence on the <br /> .scope of work and approach to obtaining site.closure prior to finalizing the work plan.An order to facili- .. <br /> tate SJCEHD's review of this project, CPL and Geomatrix are requesting a meeting with you and Mr. <br /> Mike Infurna to discuss the following: <br /> • status of work completed by others; <br /> • status of work currently being performed by Geomatri (groundwater monitoring); <br /> • preparation of a work plan and anticipated scope of wc irk to obtain closure; <br /> • developnierit of the parcels in conjunction with performing work to obtain closure; <br /> • reorganizing,oversight.of the project as one site rather than three separate sites; and <br /> • . the anticipated schedule: <br /> Geomatrix Consultants, Inc. <br /> Engineers,Geologists,and Environmental Scientists <br />