My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BYRON
>
0
>
2900 - Site Mitigation Program
>
PR0517323
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 10:29:19 AM
Creation date
2/14/2019 9:39:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517323
PE
2960
FACILITY_ID
FA0013339
FACILITY_NAME
MT HOUSE SITES 1-6
STREET_NUMBER
0
STREET_NAME
BYRON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
BYRON RD
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' REVISED SOIL AND GROUNDWATER INVESTIGATION WORK PLAN <br /> MOUNTAIN HOUSE DEVELOPMENT SITE #6 <br /> ' 1. INTRODUCTION <br /> At the request of Chevron Environmental Management Company(CEMC), Science Applications <br /> International Corporation(SAIC)presents this work plan for additional subsurface investigation at <br /> Mountain House Site#6(the site; see Figure 1). Former crude oil facilities of Chevron's Old Valley <br /> Pipeline (OVP)and the Tidewater Associated Oil Company(TAOC)pipelines are located on the site. <br /> ' Past site investigations documented the presence of total petroleum hydrocarbons(TPH)and polynuclear <br /> aromatic hydrocarbons(PAHs). Although benzene,toluene, ethylbenzene,and total xylenes (BTEX) <br /> were minor constituents of crude oil,they are also constituents of concern(COCl),as they are sometimes <br /> ' encountered at TAOC and OVP facilities. The objectives of the investigation are to evaluate the extent of <br /> soil and/or groundwater affected by the CDCs and, if necessary, recommend future assessment activities. <br /> In 2001, Condor Earth Technologies, Inc. (Condor)investigated 14,000 feet of the Byron Road corridor <br /> ' adjacent to the OVP right of way(ROW)and documented the presence of petroleum hydrocarbons in the <br /> subsurface(Condor,2001). Condor identified this site as one of six where COCs had affected soil and <br /> groundwater and indicated that more investigation was required. <br /> On March 31,2005, SAIC submitted a work plan to the Central Valley Regional Water Quality Control <br /> Board(RWQCB)to advance 30 primary and 12 contingency soil borings to assess the extent of affected <br /> media at the site(SAIC,2005). On February 1,2006, a work plan addendum was submitted, after it had <br /> ' been noticed that two borings had been omitted from the work plan's table of boring objectives(SAIC, <br /> 2006a). On March 6, 2006,the RWQCB accepted the amended work plan(RWQCB,2006). <br /> However, since the RWQCB accepted the work plan over a year ago, significant new methods have been <br /> developed for Chevron's Historical Pipeline Portfolio(HPP)investigations(e.g.,groundwater sampling <br /> using pre-packed well screens, comparison of analytical data to risk-based screening levels, testing for <br /> general minerals to evaluate groundwater potability). Also, based on further review of the accepted work <br /> ' plan,it was determined that project objectives could be achieved with fewer borings advanced in more <br /> effective locations. In order to complete a more efficient investigation using current methods, SAIC has <br /> prepared this new work plan describing how the extent of soil and/or groundwater at the site will be <br /> ' investigated. <br /> This investigation will be guided by the Technical Approach to Site Evaluation and Decision-Making, <br /> Historical Pipeline Portfolio, Central Valley Region(referred to as the Consistent Technical Approach <br /> ' [CTA]; Geomatrix Consultants,Inc. [Geomatrix],2005). The CTA specifies Central Valley RWQCB <br /> Water Quality Objectives(WQOs)as the health-based and aesthetic criteria for determining whether <br /> groundwater is affected, delineating the extent of any affected groundwater,and assessing whether further <br /> ' groundwater characterization is appropriate. Although the CTA does not prescribe criteria by which <br /> affected soil is defined,U.S.Environmental Protection Agency(EPA)Region 9 Preliminary Remediation <br /> Goals(PRGs; EPA, 2004) and San Francisco Bay RWQCB Environmental Screening Levels(ESLs; <br /> RWQCB, 2005)will be used. <br /> Soil and groundwater analytical results will also be compared to ESLs, PRGs,and WQOs as a screening <br /> step to streamline the risk assessment process. The presence of a constituent at a concentration above a <br /> ' screening level does not necessarily indicate an impact to human health or the environment. It simply <br /> indicates that potential risk may exist and that additional evaluation may be warranted. Based on <br /> comparison of analytical results to the screening levels,the site may qualify for No Further Action status. <br /> 1 rRam <br /> .;7A1I`. <br /> ' Fran Science he Solutions <br />
The URL can be used to link to this page
Your browser does not support the video tag.