Laserfiche WebLink
== BORING NO.: SB-24 SHEET 1 OF 1 <br /> t--DG:99 <br /> MEEFr1I`® PROJECT: Mountain House Development Site#6 <br /> From Science to Solutions <br /> LOCATION: Mountain House,San Joaquin County,California <br /> COORDINATES: Y 37.7761351809,X -121.521590335 PROJECT NO.: 06-6102-00-6317-120 <br /> SURFACE ELEVATION: NA DATUM: NA LOGGED BY: Sean Gehlke <br /> W ❑ E > a o z w o m GEOLOGIC COMPLETION <br /> CL "' a s J w } J Z O �2 DESCRIPTION DETAIL <br /> ❑ � >- <br /> <U) U) Z � mo w �U) <br /> Q o - <br /> HA Lean Clay with Sand (CL): about 75%F 25%S dark <br /> brown(7.5YR 3/2);moist;medium stiff. <br /> 0.0 <br /> 0.9 As above;dark reddish brown(5YR 3/4). <br /> 5 SB-24- <br /> 5' <br /> 0.0 As above;soft. 1 <br /> SB-24 6.4 feet bgs <br /> 7 feet bgs <br /> 5.1 DP As above;brown(7.5YR 4/4);soft. <br /> 50 <br /> 10 6.6 <br /> 7.1 DP Poorly Graded Sand(SP): about 20%F 80%S brown <br /> (7.5YR 4/4);moist to wet. <br /> Lean Clay (CL): about 85%F 15%S brown (7.5YR <br /> 7.2 4/4);moist;medium stiff. <br /> 15- <br /> 9.1 DP <br /> a <br /> a <br /> 0 <br /> c� <br /> 0 20 7.9 DP <br /> z <br /> w <br /> °o <br /> 7.0 DP As above;3"lens of clayey sand. <br /> a <br /> c� <br /> o As above;soft;wet. <br /> SB-24- <br /> LU8.5 23.5' <br /> LU Boring terminated at 24 feet bgs <br /> LU <br /> u <br /> DRILLING CONTRACTOR: RSI REMARKS: Hand cleared to 8 feet bgs. <br /> z DRILLING METHOD: Direct Push <br /> z <br /> w DRILLING EQUIPMENT: Geoprobe 6620 DT <br /> a <br /> °o DRILLING STARTED: 3/28/08 1 ENDED: 3/28/08 <br /> J <br />