Laserfiche WebLink
M. Scott Mansholt - 5 - 12 November 2008 <br /> Chevron <br /> Mountain House Development Site #6 <br /> • Where timely site access may become an issue, proposed boring locations may be <br /> shifted to property where access is not an issue (i.e., within the UPRR, West Byron <br /> Road; and/or existing pipeline right-of-way easements). Repositioning proposed <br /> borings would be acceptable provided the purpose of the original location is <br /> accomplished and the locations are submitted for review. <br /> • When comparing ND results for delineation needs with applicable ESLs and/or PRGs, <br /> appropriate laboratory MDLs should be used. <br />