My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BYRON
>
0
>
2900 - Site Mitigation Program
>
PR0517323
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 3:46:08 PM
Creation date
2/14/2019 9:40:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517323
PE
2960
FACILITY_ID
FA0013339
FACILITY_NAME
MT HOUSE SITES 1-6
STREET_NUMBER
0
STREET_NAME
BYRON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
BYRON RD
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2890
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. Scott Mansholt - 2 - . 6 August 2009 <br /> No Further Action Required Deterrfttion <br /> Mountain House Development Site <br /> Central Valley Water Board staff received the site specific Soil Management Plan (SMP), <br /> dated 25 November 2008 that provides guidance for interested parties who may conduct <br /> excavation and/or maintenance activities at the Site in the future. The SMP, which designates <br /> Chevron as the responsible party for any issues that arise related to the crude oil leaks, was <br /> submitted to the interested parties identified at the Site. <br /> On 10 June 2009, Central Valley Water Board staff notified interested persons of their <br /> opportunity to provide comments to Chevron's 18 March 2009 request for NFAR <br /> determination. Property owner(s) determined to have been affected by crude oil leaks from <br /> the historical pipelines located on or near the referenced site were notified by certified mail. <br /> No responses were received during the 30-day comment period. <br /> The reports concluded that site assessments, characterization, and risk assessment have <br /> provided the appropriate technical data and rationale to support a NFAR determination. <br /> If existing, additional, or previously unidentified chemical constituents at Mountain House <br /> Development Site #5 cause or threaten to cause pollution or nuisance or are found to pose a <br /> threat to public health or water quality, then: 1) nothing in this determination is intended or <br /> shall be construed to limit or preclude the Central Valley Water Board or any other agency <br /> from taking further enforcement action and 2) this letter does not relieve Chevron of any <br /> responsibilities mandated under the California Health and Safety Code and the California <br /> Water Code. Nothing in this determination shall constitute or be construed as a satisfaction or <br /> release from liability for any conditions or claims arising as a result of past, current, or future <br /> operations at Mountain House Development Site #5. <br /> If you have any comments or questions, please contact Dean Hubbard at (559) 445-5179. <br /> Pamela C. Creedon <br /> Executive Officer <br /> Attachment <br /> cc: Michael J. Infurna, San Joaquin County EHD, Stockton <br /> Karen Fitzgerald, UPRR, Omaha, NE <br /> Nader Shareghi, Mountain House Community Services District, Mountain House <br /> David Sargent, Shea Mountain House LLC, Livermore <br /> Michael Jenkins, SAIC, Sacramento <br /> Michael Hurd, SAIC, Oakland <br />
The URL can be used to link to this page
Your browser does not support the video tag.