Laserfiche WebLink
Chevr <br /> onTexaco <br /> Mountain House Sites #1 and#2 - 4 - . <br /> 26 March 2004 <br /> • Petroleum hydrocarbon-impacted soil excavated duringth <br /> treated or disposed of at an appropriatel e project would need to be <br /> Y permitted facility. managed and <br /> SUMMARY <br /> The proposed additional borings and sampling program appears <br /> locations where the proposed bridge construction and stre to be a <br /> groundwater investigations in the vicinity of Mountain Hou appropriate to investigate the <br /> ambed alterations will occur. <br /> House Creels may be warranted in hetfuture.ional and <br /> Appropriate permitting for proper handling <br /> soil and storage and/or disposal of petroleum hydrocarbon-im act <br /> groundwater encountered during the projects needs to be addressed ' <br /> State policy, guidelines, and re p ed <br /> discussed above, dations before construction commences and rthrough accordance <br /> the r Project <br /> These issues should be coordinated with Trimarlc's project schedule. applicable <br /> p ject as <br />