My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BYRON
>
0
>
2900 - Site Mitigation Program
>
PR0517323
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 3:46:08 PM
Creation date
2/14/2019 9:40:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517323
PE
2960
FACILITY_ID
FA0013339
FACILITY_NAME
MT HOUSE SITES 1-6
STREET_NUMBER
0
STREET_NAME
BYRON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
BYRON RD
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2890
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevr <br /> onTexaco <br /> Mountain House Sites #1 and#2 - 4 - . <br /> 26 March 2004 <br /> • Petroleum hydrocarbon-impacted soil excavated duringth <br /> treated or disposed of at an appropriatel e project would need to be <br /> Y permitted facility. managed and <br /> SUMMARY <br /> The proposed additional borings and sampling program appears <br /> locations where the proposed bridge construction and stre to be a <br /> groundwater investigations in the vicinity of Mountain Hou appropriate to investigate the <br /> ambed alterations will occur. <br /> House Creels may be warranted in hetfuture.ional and <br /> Appropriate permitting for proper handling <br /> soil and storage and/or disposal of petroleum hydrocarbon-im act <br /> groundwater encountered during the projects needs to be addressed ' <br /> State policy, guidelines, and re p ed <br /> discussed above, dations before construction commences and rthrough accordance <br /> the r Project <br /> These issues should be coordinated with Trimarlc's project schedule. applicable <br /> p ject as <br />
The URL can be used to link to this page
Your browser does not support the video tag.