My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 12:16:02 PM
Creation date
2/14/2019 11:47:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/06/2001 04: 38 2093671--q FOOTHILL ENGINES SIG PAGE 01 <br /> tErBVIRID;tl{71in 1.7 FA, H -; STI D.11610141 <br /> 3014 E. f <br /> Fa <br /> xfrorn <br /> P.Q. Sox 3h::, Stx':to", CO. 95201-0388 FOOTHILL ENGINEERING Fax 20V=7-,1X9) 468-3420 <br /> Phone 209/368-8381 ° w�c gad <br /> To: Mike Infurna -� )'-P'o'led vvth change,' Sea Remarks <br /> -M Dir-Qnprev&d: Sec, Rai..^arks <br /> Of: San Joaquin County Healthmu,-k's' <br /> Fax: 468-3433 <br /> Phone: 1:) <br /> r 'ZI✓!.^'..0 r�fi yr: ;,a ty to that <br /> Pages: 1/3 including this cover sheet. i , i`;; i; � ,;:r '; r,.ti fir, but <br /> Date.April 6, 2001 �'," �1 , w.. s r Stale i;aws or <br /> Subject: Modification to 300 S. California, Stockton - Workplan of 11/17/00 <br /> Dear Mike, <br /> Please approve the following change to the existing above stated workplan. <br /> PROPOSED CHANCE <br /> Monitoring well MW#7D was not installed as per the original workplan. In place of this <br /> monitoring well, I wish to install MW#9 as shown on the map attached. MW#9 will be used to <br /> determine the vertical extent of the contamination plume at the point of the spill.. The soil bore <br /> will be made to +/- 125' with soil samples extracted at five feet intervals starting at twenty feet of <br /> depth. Sample analysis on the soil samples will be the same as the original workplan. <br /> Construction of the monitoring well will be as shown in the attached diagram. <br /> With your approval the above work will begin on April 11, 2001 <br /> Respectfully submitted, <br /> Foot ' I Bring <br /> Ervin Rife burg <br /> From the desk of..Ery <br />
The URL can be used to link to this page
Your browser does not support the video tag.