Laserfiche WebLink
Recommendations <br /> Foothill Engineering recommends that monitoring well sampling be continued on a quarterly basis <br /> with analysis for TPHg, BTEX, and oxygenates. With the completion of CPT#7 the limits of the <br /> plume have been defined. Foothill Engineering recommends proceeding with the Site Conceptual <br /> Model and the Preliminary Investigation and Evaluation Report (PIER). <br /> Please contact Mike Vlach at (916) 729-5184 if you have any questions on this report. <br /> Respectfully submitted <br /> QFcOFESS�_'W <br /> Foothill Engineer' co� ��oBtGz <br /> C57 z <br /> XP.12-31-05 <br /> Mike Vlach, PE S� FCAL�Fo��\� <br /> Attachments: Groundwater Analysis Recap, Site Maps,Del-Tech Monitoring Report, Lab Reports, <br /> • CPT47 Report from Gregg <br /> cc: Michael D. & Sharon Olivarez, 436 W. Scotts Ave. Stockton, Ca. 95203 <br /> 5 <br />