My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
ARCHIVED REPORTS XR0000882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 2:16:35 PM
Creation date
2/14/2019 1:12:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000882
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On May 2 and 3, 2000 the soil borings for both MW#5 and MW#6 were made as described in the <br /> work plan of 311712000. Monitoring wells were installed in both of these soil bores. The work plan <br /> of 3/17/2000 also included a soil bore and monitoring well (MW#4)to be installed in the sidewalk <br /> on the north side of Lafayette Street. This soil bore was not completed as planned. An unknown <br /> underground storage tank was encountered in the direct path of the soil bore. As a result of this <br /> encounter, the soil bore was abandoned and the local agencies were notified. <br /> A work plan to expand the horizontal definition of the contamination plume was approved in <br /> December of 2000.This work plan called for the installation of three new CPT's within the Caltrans <br /> R/W to the north of the project site. These CPT's were completed on March 8, 2001 and soil and <br /> water samples were extracted to a depth of 125 feet. Also, included in the work pian of December <br /> 2000 was the installation and testing of four new monitoring wells,MW-8S,MW-8D,MW-7,MW- <br /> 9, to be placed on the project site or the adjacent property. These monitoring wells were completed <br /> on April 11, 2001. <br /> In January of 2002 the owners of this property removed the apartment house structure on the east <br /> side of the property. At the time of this report that portion of the property is clear without any <br /> structures or other improvements. <br /> On August 9 & 10, 2002 the extraction well installed for the pump test was completed and <br /> developed. In December of 2002,work crews under the control of others,removed the buildings on <br /> the lot directly East of the site. This lot is not owned by the Olivarez's. Monitoring wells MW-8S <br /> and MW-81)were damaged and the caps and covers were removed along with the upper portion of <br /> the casing by the crews removing the buildings. These monitoring wells were repaired in March of <br /> 2003. <br /> REPORT OF FINDINGS FOR THE THIRD QUARTER MONITORING EVENT <br /> Procedure <br /> On September 25,2003,Del Tech Geotechnical Support Services extracted water samples from all <br /> of the monitoring wells on the above stated property and extraction well EW-1. The work was <br /> supervised by Foothill Engineering. <br /> All samples were extracted using the tube with check valve pump system with exception of EW-1. <br /> Purge rates were+/- .5 gpm on monitoring wells and the physical properties of the groundwater can <br /> be found in the Del-Tech Field Report which is attached and part of this report. <br /> All three replacement wells were found to be dry on the date of this sampling event. The original <br /> monitoring wells (MW-1,MW-2,MW-3)were sampled for analysis.The original monitoring wells <br /> (MW-1, MW-2, MW-3) were used to establish the groundwater elevation and hydraulic gradient. <br /> All samples were transported under chain of custody to Sherwood Labs of Hilmar, California for <br /> analysis by EPA method SW 8020F. Samples were transported under chain of custody from <br /> Sherwood to Entech Analytical Labs for analysis by EPA Method 8260FA for oxygenates including <br /> 1,2-DCA and EDB. All water sample analysis and groundwater elevations are summarized in the <br /> attached tabular recap sheet. Copies of the original laboratory data sheets from this sampling event <br /> are also attached and are a part of this report. <br /> . Findings <br /> The groundwater elevation at time of monitoring was about 1'lower than the last monitoring event. <br /> MW-1 continues to have the highest concentration of the monitoring wells with gasoline <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.