Laserfiche WebLink
F'OOTHIEE <br /> ENGINEERING <br /> 12793 PADDY CREEK LANE LODI. CA 95240 <br /> PH. (209) 368-9381 FAX (209) 367-1163 <br /> Mr. Michael Infurna July 11, 2001 <br /> San Joaquin County Public Health Services JUL 1 9 2001 <br /> Environmental Health Division <br /> P. O. Box 388 ENVII OMMENT HEALTH <br /> Stockton, CA 95201 PERMIT/SERVICES <br /> Site Code #1038 <br /> Subject: Michael D. & Sharon Olivarez, 300 S. California St. Stockton, Ca. <br /> Monitoring Well and CPT Installation Report <br /> Dear Mr. Infurna. <br /> Please find below the report covering the installation of three CPTs and four monitoring wells on <br /> the above stated property. <br /> MONITORING WELL AND CPT INSTALLATION REPORT <br /> Site History <br /> Five fuel USTs and one used motor oil tank were removed by Jim Thorpe Oil in November 1992 <br /> under a permit from the PHS/EHD. Soil samples taken from under the USTs and the dispensing <br /> equipment indicated the presence of hydrocarbons.,Spoil from the excavation was found to contain <br /> hydrocarbon contamination. <br /> Clearwater Group submitted a Work Plan to install three soil borings with monitoring wells <br /> constructed in the same boring. The work described in the Clearwater Work Plan was completed <br /> in March of 1995. <br /> The excavation for the removal of the USTs was backfilled by Jim Thorpe Oil in April 1996. The <br /> excavation spoil was used for backfill material. <br /> i <br /> Foothill Engineering was requested by the owner to sample the three monitoring wells that were <br /> installed by Clearwater at various times and the analysis of those samples is attached. Monitoring <br /> wells MW-i and MW-2 continue to contain high levels of gasoline contamination. MW-3 has much <br /> lower levels of gasoline contamination (see a recap sheet attached). <br /> On August 23, 1999, the PHS/EHD approved a Work Plan submitted by Foothill Engineering to <br /> install replacement wells for MW#1, MW#2, and MW#3. These replacement wells were installed <br /> to correct the over screen conditions of the existing monitoring wells. Also, included in this Work <br /> Plan was the installation of three CPTs. To date CPT#1, CPT#2 and CPT#3 have been installed. <br /> Soil and groundwater samples extracted during the installation of CPTs indicate gasoline <br /> contamination to a depth of eighty-five feet (see a recap attached). <br /> 1 <br />