Laserfiche WebLink
1.0 PURPOSE <br /> This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Location Map - Figure 1). This SSP <br /> addresses the expected potential hazards that may be encountered during this project. <br /> The provisions set-forth in this SSP will apply to Clearwater Group, Inc. .(Clearwater) <br /> employees and any subcontractors working for Clearwater at the job site. All personnel <br /> Iworking for Clearwater, including subcontractors, at the job site must read this SSP, and <br /> sign the attached Compliance Agreement (Appendix A) before entering the work area. <br /> 2.0 FACILITY BACKGROUND <br /> 2.1 Site Layout and Histo Site location is shown on Fig. 1 site ma on Fig. 2 <br /> Y History ( g � P g ) <br /> Previous Site Operations: C-92&_S±aJ1jm i 1AM6 S6Q From: To: <br />' From: To: <br /> Is site currently active? Yes No <br /> Work surface is: Asphalt Concrete Gravel/Dirt All S[Lv4*-0O3!; -frrese4 <br /> ASTs/USTs present?: Yes No Location: <br /> Number of USTs removed:-,o Location: Ncw:lJ . S7id-e Date removed: <br /> 04 SJ <br /> 2.2 Soil Contamination <br /> Maximum benzene concentration in soil: ylweyl Location: Mt,).t Q.+ 3i � 1093 <br /> Maximum TPH concentration in soil: ZOoo :ppnr, Location: <br /> 2.3 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site:,,, <br /> Maximum dissolved benzene concentration to date: Well:IlAW-2- <br /> Latest <br /> lW F2 <br /> Latest maximum dissolved benzene concentration: same, Well: <br /> 2.4 Remediation <br /> Previous remedial system operation: NQUE From To: <br /> I <br /> Active remediation: NONE <br /> From To: <br /> Number of SVE wells: AS wells: GWE wells: <br /> IOther (trenches, sumps,..): <br /> Remediation equipment on site:-NONE <br /> I <br />