Laserfiche WebLink
1.0 PURPOSE <br /> This Site Safety Plan (SSP) establishes the basic safety guidelines and requirements for <br /> the above scope(s) of work at the above site (see Site Location Map - Figure 1). This SSP <br /> addresses the expected potential hazards that may be encountered during this project. <br /> The provisions set-forth in this SSP will apply to Clearwater Group, Inc. (Clearwater) <br /> employees and any subcontractors working for Clearwater at the job site. All personnel <br /> working for Clearwater, including subcontractors, at the job site must read this SSP, and <br /> sign the attached Compliance Agreement (Appendix A) before entering the work area. <br /> i <br /> 2.0 FACILITY BACKGROUND <br /> 2.1 Site Layout and History (Site location is shown on Fig. 1, site map on Fig. 2) <br /> Previous Site Operations: S 5"ra11&x d sko-o From: To: <br /> From: To: <br /> I <br /> Is site currently active? Yes No <br /> Work surface is: Asphalt Concrete Gravel/Dirt <br /> ASTs/USTs present?: Yes N Location: <br /> Number of USTs removed: Location: I?00 �\ -Cc Date removed: 1\ - <br /> 2.2 Soil Contamination <br /> Maximum benzene concentration in soil: O -15 e f ocation: <br /> Maximum TPH concentration in soil: S00 p <br /> so"� 04- <br /> { Y <br /> kY1'e^ 'GS i5 (o-4-C7 <br /> 2.3 Ground Water Wells and Contamination <br /> Number of monitoring wells at the site: <br /> Maximum dissolved benzene concentration to date: N //-\ Well: <br /> Latest maximum dissolved benzene concentration: 1A Well: <br /> 2.4 Remediation <br /> Previous remedial system operation: A0,01 Ci From To: <br /> Z- <br /> Active remediation: V%D^- <br /> Number of SVE wells: AS wells: 14Ilk- GWE wells: N <br /> Other (trenches, sumps,..): <br /> . Remediation equipment on site: -,\C>rePi <br />