Laserfiche WebLink
12 March 2010 <br /> AGE-NC Project No . 99-0682 <br /> Page 2 of 2 <br /> INTERIM REMEDIATION SCHEDULE <br /> AGE anticipates the initiation of SVE during the second quarter 2010 . Installation of the SVE unit <br /> and piping connection will occur during the second quarter 2010, following the installation of <br /> dedicated electrical and natural gas meters at the site, and Pacific Gas & Electric finalization of the <br /> utilities. Additionally, source testing will be conducted with the San Joaquin Valley Air Pollution <br /> Control District. <br /> If you have any questions orrequire farther information, please contact our office at (209) 467- 1006 . <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> OAL GO <br /> QQOFy�SpM <br /> No. 7473 t <br /> Ally L. Colavita William R. Little s� a+gyp <br /> Project Scientist Senior Project Geologist tiF ens <br /> California Professional Geologist No. 7473 <br /> cc : Mr. Gary Stallworth <br /> Mr. Jim Barton, California Regional Water Quality Control Board - Central Valley Region <br /> Advanced GeoEnvironmental, Inc. <br />