Laserfiche WebLink
a <br /> 30 January 2014 <br /> AGE Project No . 99-0682 <br /> Page 28 of 28 <br /> Field parameters and laboratory samples will be collected from wells MWAA, MW-6, <br /> MW-7, MW-8 and MW- 10 and will be monitored and tested for the constituents and <br /> parameters listed above . <br /> EQUIPMENT DECONTAMINATION <br /> Upon completion of each injection event all equipment will be rinsed and removed of any <br /> oxidant material . All rinseate accumulated during the injection activitywill be stored on-site <br /> in an approved DOT container prior to its removal and disposal . <br /> 14. 0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily <br /> exercised by environmental consultants practicing in this or similar localities . The findings <br /> were based upon analytical results provided by an independent laboratory. Evaluations of <br /> the geologic/hydrogeologic conditions at the site for the purpose of this investigation are <br /> made from a limited number of available data points (i .e. monitoring wells, soil borings, soil , <br /> vapor, and groundwater samples) and subsurface conditions may vary away from these <br /> data points. No other warranty, expressed or implied , is made as to the professional <br /> recommendations contained in this report. <br /> Advanced GeoEnvironmental, Inc. <br />