My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2900 - Site Mitigation Program
>
PR0001485
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 4:37:45 PM
Creation date
2/14/2019 3:40:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0001485
PE
2950
FACILITY_ID
FA0004566
FACILITY_NAME
EMILS LIQUOR
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
02
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHFENVIRONMEMAL CONSVTT-JVTS, INC. <br /> Health & Safety Plan <br /> 1 <br /> ' 1.0 HEALTH AND SAFETY PLAN <br /> WHF Environmental Consultants, Inc., has adopted the following health and safety <br /> procedures for working with organic vapors and liquid contaminants encountered <br /> during drilling and excavation of subsurface soil. The purpose of this program is to <br /> ' provide health and safety precautions for the initial and subsequent site visits until the <br /> nature and magnitude of the contaminants have been defined. <br /> 1.1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean <br /> ups will have an assigned responsibility. The outlined responsibilities will esta- <br /> ' blisb standards for personnel protective wear, safety procedures and provide for <br /> emergency actions which could arise during project operations. <br /> ' 1.2 Project Manager (Pill) <br /> The Project Manager directs all project operations. Project Manager (PM), ill <br /> v <br /> coeeration with the Project Safety Officer (PSO), has the primary responsi- <br /> bility for ensuring that the safety plan is read, signed, and fully understood by <br /> all employees and outside persons allowed around or within designated working <br /> perimeters of the job site. <br /> ' In cooperation with the PSO, he is responsible for ensuring that at all times <br /> during project operations, all employees adhere strctly to the Health and Safety <br /> Plan. <br /> 1.3 Project Safety Officer (PSO) <br /> The PSO shall direct and ensure that all employees comply with the Health and <br /> Safety Plan. The PSO has the primary responsibility for: <br /> ' <br /> I. Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.