Laserfiche WebLink
Work Plan:Environmental Sampling of Soil Export Materials <br /> 1506 N.California St. <br /> Page 3 <br /> 4. REPORTING <br /> Condor will prepare the Soil Characterization Report detailing ahe findings of the investigation to-be <br /> submitted to the SJCEHD and the Client. The report will include';a discussion of the field and laboratory <br /> procedures used to conduct the investigation and a discussion.and';presentation of the analytical results. <br /> 5. PROJECT SCHEDULE <br /> Upon approval of this work plan by the SJCEHD and acquisition of the boring permit, the field portion of <br /> the investigation is scheduled for May 9 through 13, 2005. A report can be submitted to the SJCEHD by <br /> June 15, 2005. If you need additional information or have any questions,please call Alex Dewitt at(209) <br /> 234-0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> hereasa A.Jo exa der B. e ltt <br /> Staff Geologist California Registered Geologist#7502 <br /> i <br /> I: F <br /> r , <br /> P:\4000_pg\4634 St.Joseph's_Women&Children Pavilion\Work Plans\4634 WP.doc <br /> Is <br /> CONDOR <br /> '1 <br />