Laserfiche WebLink
I Work Plan:Environmental Sampling of Soil Export Materials <br /> 1517 N.California St. <br /> Page 3 <br /> Method 8082, and CAM 17 Metals by EPA Methods 6010B and 7417A. Additionally,asbestos analyses <br /> j will be completed for the two western composite soil samples. <br /> 4. REPORTING <br /> Condor will prepare the Soil Characterization Report detailing the findings of the investigation to be <br /> submitted to the SJCEHD and the Client.The report will include::a discussion of the field and laboratory <br /> procedures used to conduct the investigation and a discussion and presentation of the analytical results. <br /> 5. PROJECT-SCHEDULE <br /> Upon approval of this work plan by the SJCEHD and acquisition of..the'boring permit, the field portion of <br /> the investigation is scheduled for May 9 through 13, 2005. A''report can be submitted to the SJCEHD by <br /> June 15, 2005. If you need additional information or have any questions, please call Alex Dewitt at(209) <br /> 234-0518. a <br /> Respectfully submitted, , <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> I <br /> Th reasa A. Jon s Al'� xander B. Dewitt <br /> Staff Geologist California Registered Geologist#7502 <br /> i <br /> P:\4000_pp14633 St.Joseph's_Parking Structure\Work Plans\4633 WP.doc <br /> a <br /> I! <br /> iM� CONDOR <br />