Laserfiche WebLink
Ca EPA Pete Wilson <br /> Governor <br /> March 13, 1998 <br /> State Water <br /> Resources <br /> Control Board <br /> Division of Norman Higgins <br /> Clean Water P O Box 369 <br /> Programs Clements,CA 95227 <br /> Mailing Address: <br /> P.O.Box 944212 PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 11775, <br /> Sacramento,CA <br /> 94244-2120 SITE ADDRESS: 2315 CALIFORNIA ST N,S OCKTON,CA 95204 <br /> 2014 it Street, <br /> Suite 130 $20,975 of the Foothill Engineering proposal totalin $21,575 to install 3-75' nested monitoring wells, <br /> p <br /> Sacramento,CA provide traffic control to installone of the wells,analyze 45 samples by EPA Method 8015/8020 and 9 <br /> 95814 samples by EPA Method 8260,and prepare a technical report is pre-approved subject to the following <br /> (916)227-7748 <br /> FAX(916)2274530 prOViSiOns: <br /> World Wide Web . Pre-approval of the EPA 8015/8020 is limited to$65/sample, including mark-up(this accounts for <br /> http://www.swrcb.ca. <br /> gov/--rwphome/ $450 of the difference in the pre-approved amount). Pre-approval of the EPA 8260 limited to <br /> fundhome.htm $150/sample,including mark-up(this accounts f Dr$150 of the difference in the pre-approved <br /> amount). This issue was discussed with Ervin Rifenburg of Foothill Engineering,who indicated that <br /> he would contact additional labs to obtain multi le estimates to either comply with the pre-approved <br /> amount,or support costs in excess of the pre-approved amount(if additional cosfs are requested,) <br /> should be contacted to discuss the matter). <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it to <br /> remain valid. If a different scope of work becomes necessary,then you must request pre-approval of <br /> costs on the new scope of work. <br /> • The work products must be acceptable to tb.Re 'onal Bo#jd(and/or local agency). <br /> • The three-bid requirement has been waived for ffiis pre-approval. For any future corrective action <br /> work,you must obtain three competitive,comparable bids and request pre-approval of costs from the <br /> Fund(or request and be granted a bid waiver). <br /> Please remember that it is still necessary to submit a actual costs of the work as explained in the <br /> Reimbursement Request Instructions to confirm that the costs are consistent with this pre-approval before <br /> you will be reimbursed. To make this easier,insure thatyour consultant prepares his,invoices to match <br /> the format of the original estimate, anti provides reasonable explanations for any changes made in the <br /> scope of work or increases in the casts. When the invoices are submitted you must include copies of all: <br /> • subco>ttractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the oversight agency. <br /> Our mission is to preserve and enhance th e quality of California's water resources,and <br /> Recycled Paper ensure their proper allocation and efficient us ifor the benefit of present and future generations. <br />