Laserfiche WebLink
ENGINEERING <br /> 12793 PADDY CREEK LANE LCJDI. CA 95240 <br /> PH (209)368-9381 FAX 02093 367-1163 <br /> Mr Michael Infurna o t ``�f ���1, <br /> San Joaquin County Public Health Services May 22, 2003 n <br /> 304 E Weber Third Floor �� ,� ZOlJ3 <br /> Stockton, CA 95202 <br /> ENS ��AttH <br /> Subject Mrs Helen Higgins/Vogue Cleaners r�pR1SER��}G�� <br /> 2315 N California Street <br /> Stockton, CA Site code 231032 <br /> Dear Mr Infurna Global ID T0607700741 <br /> Please find below the report of the findings for water samples extracted from monitoring wells on <br /> the Vogue Cleaners site on 3120/03 <br /> FIRST QUARTER 2003 MONITORING WELL SAMPLING EVENT <br /> SITE HISTORY <br /> The site has a long history of use as a cleaning establishment and presently has the same use On <br /> June 6, 1996, Thorpe Oil removed two empty underground storage tanks from the property under <br /> a permit from the PHS/EHD Soil samples from the tank excavation were obtained using standard <br /> • methods and locations The sample from under Tank#1 was taken at a depth of+/-eight feet The <br /> sample from Tank#2 was taken at a depth of+/- nine feet Both these samples and samples from <br /> the excavation spoil showed evidence of hydrocarbon contamination (See map enclosed) All of <br /> the above samples were analyzed by GeoAnalytical Laboraton es, Inc The Iocation of Tank#1 is <br /> between two structures and is 25'from the closest access point by drilling equipment Tank#2 can <br /> be accessed by vertical drilling equipment <br /> Phase 1 of the Site Investigation required drilling a slant soil boring under Tank#1 and a vertical <br /> soil bore at the location of Tank 92(See the attached soil and water analysis for BH#1 and MW#1) <br /> Phase 2 of the Site Investigation was conducted to define the vertical and horizontal extent of the <br /> contamination plume It was completed on 5/28/98 with the installation of MW#2S, MW#2D, <br /> MW#3S, MW#3D, and MW#4S, MW#4D A double monitoring well was installed in each <br /> location The shallow wells (noted by the "S" letter) had a total depth of+/-55' and the deep <br /> monitoring wells had atotal depth of+/-75' The original set of water samples was made on 6/11198 <br /> (see water sample analysis, attached) The latest water samples were taken 09/14/01 and are the <br /> subject of this report <br /> Monitoring wells MW#5S and MW#5D were install on 11/07/01 in the parking lane on the cast <br /> side of California street Soil samples indicate the presents of 1,2-Dichloroethane and 1,1- <br /> Dichloroethene in low concentrations BTEX was not found in this new soil bore or water samples <br /> SIMI-ANNUAL SAMPLING EVENT REPORT OF 3/20/2003 <br /> SAMPLING PROCEDURE <br /> 1 <br />