My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:25:00 AM
Creation date
2/15/2019 8:24:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> • um <br /> Ms. Vickie McCartney,REHS Page 5 <br /> San Joaquin County Environmental Health Department <br /> February 13, 2004 <br /> Deep Monitoring Well Drilling and Sampling <br /> The total depth of the boring for the proposed deep monitoring well will be approximately 100 feet bgs. <br /> Groundwater at the site is expected at approximately 45 feet bgs. The boring will be drilled using an <br /> HSA-equipped drill rig with 8.25-inch outside-diameter(OD) augers to accommodate installation of a 2- <br /> inch-diameter well. During drilling of the proposed deep monitoring well, soil samples will be collected <br /> at 5-foot intervals to a depth of approximately 75 feet bgs. Soil samples will be collected continuously <br /> from approximately 75 feet bgs to total depth with a modified California split-spoon sampler to aid in <br /> hydrogeologic characterization of the previously unexplored subsurface below approximately 75 feet <br /> bgs. A URS geologist will log the soils according to the Unified Soil Classification System. <br /> Soil Vapor Extraction Well Drilling and Sampling <br /> The total depth of the boring for the proposed soil vapor extraction well will be approximately 40 feet <br /> bgs. The boring will be drilled using an HSA-equipped drill rig with 10.25-inch OD augers to <br /> accommodate installation of a 4-inch-diameter well. During drilling of the proposed soil vapor <br /> extraction well, soil samples will be collected at 5-foot intervals with a modified California split-spoon <br /> sampler. A URS geologist will log the soils according to the Unified Soil Classification System. <br /> Air Sparging Well Drilling and Sampling <br /> The total depth of the borings for the 10 proposed air sparging wells will be approximately 65 feet bgs. <br /> The borings will be drilled using an HSA-equipped drill rig with 8.25-inch OD augers to accommodate <br /> installation of 2-inch-diameter wells. During drilling of the proposed air sparging wells, soil samples <br /> will be collected at 5-foot intervals with a modified California split-spoon sampler. A URS geologist <br /> will log the soils according to the Unified Soil Classification System. <br /> WELL CONSTRUCTION <br /> Deep Monitoring Well <br /> The deep monitoring well will be constructed using 2-inch inside-diameter (ID), Schedule 40, flush- <br /> threaded polyvinyl chloride (PVC) well casing. The well will be screened in a water-bearing zone <br /> (saturated sand horizon) at approximately 100 feet bgs with 5 feet of 0.020-inch machine-slotted well <br /> screen. Exact screen interval will be determined in the field by the URS geologist. A Monterey No. 3 <br /> silica sand filter pack will be installed from the bottom of the baring to 3 feet above the well screen. A <br /> 3-foot bentonite transition seal will be placed above the sand pack and neat cement will be used to seal <br /> the remaining annular space to the surface. The surface completion will consist of an 8-inch flush- <br /> KAWprocessV5 BP ARCO\02186V196 WP 04.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.