My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:25:00 AM
Creation date
2/15/2019 8:24:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> URS <br /> Ms. Vickie McCartney,REHS Page 7 <br /> San Joaquin County Environmental Health Department <br /> February 13,2004 <br /> Report Preparation <br /> Following receipt of analytical results, a report will be prepared summarizing the results of the <br /> investigation and well installation activities. The report will include soil and groundwater analytical <br /> results, the well drilling and construction procedures, boring logs, and well construction specifications. <br /> If you have any questions or comments regarding this letter, please call Mr. Jeff Brooks at <br /> (916)679-2383. <br /> Sincerely, <br /> URS Corporation Americas S��RED p�0 <br /> pAt1(F <br /> No .7120 s <br /> Exp. 1 <br /> Jeff Brooks Vernon Elarth, RG `req <br /> Staff Geologist Project Manager OF CAL�F� <br /> Enclosures: Figure I Site Location Map <br /> Figure 2 Proposed Well Locations <br /> Table 1 Groundwater Elevation and Analytical Data <br /> Attachment A SJCEHD Correspondence <br /> Attachment B Sampling and Analysis Procedures <br /> cc: Mr. Paul Supple,Atlantic Richfield Company <br /> Mr. James Barton, RWQCB-CVR <br /> Project File <br /> KAWprocessU5 BP ARCOW18612186 WP 04.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.