Laserfiche WebLink
tj <br /> Stantec <br /> Work Plan for Vapor Probe Destruction, Well Destruction, and Well Installation [HE CCIEWEDD <br /> ARCO Service Station No.2186 <br /> October 14,2008 O C T <br /> ENVIRONMENT HEALTH <br /> TABLE OF CONTENTS <br /> PERMIT/SERVICES <br /> 1.0 INTRODUCTION AND SITE INFORMATION.................................................................... 1 <br /> 9.1 Site History and Previous Investigations. ........................................... 1 <br /> ....................... <br /> 2.0 PROPOSED SCOPE OF WORK.......................................................................................2 <br /> 2.1 Site Health and Safety Plan................................................................................................2 <br /> 2.2 Permitting and Preliminary Field Activities..........................................................................2 <br /> 2.3 Soil Vapor Probe Destruction .............................................................................................3 <br /> 2.4 Well Destruction.................................................................................................................. 3 <br /> 2.5 Soil Boring Advancement, Soil Sampling, and We11 Installation......................................... 3 <br /> 2.6 Soil Sample Analysis ..........................................................................................................4 <br /> 2.7 Well Development.................................. .........................................................4 <br /> 2.8 Waste Handling and Disposal............................................................................................5 <br /> 2.9 Reporting........................................................•........:........................................................... 5 <br /> 2.10 Schedule........................................................................................................................... 5 <br /> 3.0 LIMITATIONS .....................................................................................................................6 <br /> LIST OF FIGURES <br /> Figure 1 Site Location Map <br />` Figure 2 Site Plan with Proposed Well Locations <br /> LIST OF TABLES <br /> Table 1 Well Construction Details <br /> LIST OF ATTACHMENTS <br /> Attachment A SJCE=HD Letter Dated August 22, 2008 <br /> Attachment B Soil Boring logs for VP-1 through VP-3, MW-1, and MW-3 <br /> 2186 Work Plan for Vapor Probe Destruction, Well Destruction, and Well Installation.doc i <br /> I <br /> tr <br />