My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:30:44 AM
Creation date
2/15/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tj <br /> Stantec <br /> Work Plan for Vapor Probe Destruction, Well Destruction, and Well Installation [HE CCIEWEDD <br /> ARCO Service Station No.2186 <br /> October 14,2008 O C T <br /> ENVIRONMENT HEALTH <br /> TABLE OF CONTENTS <br /> PERMIT/SERVICES <br /> 1.0 INTRODUCTION AND SITE INFORMATION.................................................................... 1 <br /> 9.1 Site History and Previous Investigations. ........................................... 1 <br /> ....................... <br /> 2.0 PROPOSED SCOPE OF WORK.......................................................................................2 <br /> 2.1 Site Health and Safety Plan................................................................................................2 <br /> 2.2 Permitting and Preliminary Field Activities..........................................................................2 <br /> 2.3 Soil Vapor Probe Destruction .............................................................................................3 <br /> 2.4 Well Destruction.................................................................................................................. 3 <br /> 2.5 Soil Boring Advancement, Soil Sampling, and We11 Installation......................................... 3 <br /> 2.6 Soil Sample Analysis ..........................................................................................................4 <br /> 2.7 Well Development.................................. .........................................................4 <br /> 2.8 Waste Handling and Disposal............................................................................................5 <br /> 2.9 Reporting........................................................•........:........................................................... 5 <br /> 2.10 Schedule........................................................................................................................... 5 <br /> 3.0 LIMITATIONS .....................................................................................................................6 <br /> LIST OF FIGURES <br /> Figure 1 Site Location Map <br />` Figure 2 Site Plan with Proposed Well Locations <br /> LIST OF TABLES <br /> Table 1 Well Construction Details <br /> LIST OF ATTACHMENTS <br /> Attachment A SJCE=HD Letter Dated August 22, 2008 <br /> Attachment B Soil Boring logs for VP-1 through VP-3, MW-1, and MW-3 <br /> 2186 Work Plan for Vapor Probe Destruction, Well Destruction, and Well Installation.doc i <br /> I <br /> tr <br />
The URL can be used to link to this page
Your browser does not support the video tag.