My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:30:44 AM
Creation date
2/15/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON <br /> SECOR � _ www.secor.com <br /> "001INTERNA-11JNAL 3017 Kilgore Road,Suite 100 <br /> S F C Q R INCORPORATED 916-8610400v A 95670 <br /> TEL <br /> 915-861-0430 FAX <br /> September 14, 2007 SEP 1 7 2007 <br /> Ms. Victoria L. McCartney <br /> San Joaquin County Environmental Health Department ENVIRONMENT HEALTH <br /> 600 East Main Street PMMIT/SERVICES ' <br /> Stockton, California 95202-3029 <br /> RE: Addendum to Work Plan for Soil Vapor Survey dated August 9, 2007 <br /> ARCO Service Station No. 2186 / f � r� -t- <br /> ARCO <br /> 3212 North California Street w p , ` O r i <br /> Stockton, California 94570 V,AA <br /> SECOR Project No.: 776P.02186.02.0136 <br /> !0 ` r ./ <br /> Dear Ms. McCartney: n llrr Y <br /> This letter, prepared by SECOR International Incorporated (SECOR) on behalf of Atlantic <br /> Richfield Company (ARC), a BP Affiliated Company, presents an addendum to SECOR's Work <br /> Plan for Soil Vapor Survey dated August 9, 2007 for the site referenced above. This addendum <br /> is based upon a letter from the San Joaquin County Environmental Health Department <br /> (SJC/EHD) dated August 24, 2007, and has been prepared in order to address the concerns <br /> from the SJC/EHD letter. <br /> 1. VP-1 will be installed on the eastern portion of the property and located in between MW-1 <br /> ! <br /> and the residential home adjacent to the east side of the site. <br /> 2. Wells MW-2, MW-3, MW-5, MW-6, MW-7, MW-87and VW-will be monitored and sampled F <br /> annually during the first quarter beginning in the year 2008. <br /> 3. MW-4 will be monitored and sampled semi-annually during the first and third quarter <br /> beginning in the year 2008. <br /> 4. MW-1, VW-1 B, VW-26, and VW-313 will be the only wells monitored and sampled in the <br /> fourth quarter 2007 and quarterly thereafter. <br /> 5. ARCS executing consultant, Stratus Environmental, Inc. (Stratus) who monitors and samples <br /> the wells will be notified to allow adequate time for the groundwater to stabilize before taking <br /> depth to water measurements. <br /> 6. Stratus will notify the SJC/EHD at least one week prior to the scheduled fieldwork. <br /> i <br /> I � <br /> 2186 workplan Addendum 907.doc SECOR Intemational incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.