My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:30:44 AM
Creation date
2/15/2019 8:37:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> TABLE 1 <br /> Soil Boring and Well Construction Details <br /> ARCO Service Station No. 2186 <br /> 3212 North California Street, Stockton,CA <br /> Construction Elevation Boring Depth Borehole Casing Casing Slot Size Screened Filter Pack Bentonite Seal Cement Seal I <br /> Well I.D. Date (TOC feet) (feet bgs) Diameter Diameter Material (inches) Interval Interval Interval Grout Interval Comments <br /> (inches) (Inches) (feet bgs) (feet bgs) (feet bgs) (feet bgs) <br /> Soil Borings(B) <br /> B-2 8128/1995 15.0 25 8 - - - - - - 0-25 <br /> B-6 9/611995 15.0 25 8 - - - - - - 0-25 <br /> BH-3 4114/2004 - 120.5 8 - - - -- - 0-120.5 <br /> CPT-1 8123/1999 - 83 2 - - - - - - 0.5.83 <br /> CPT-2 8123,24!1999 - 81.5 2 - - - - 0.5-81.5 <br /> CPT-3 8124,26/1999 - 81.5 2 - - - - - - 05-81.5 <br /> Monitoring Wells(MW) <br /> B-11MW-1 8129/1995 14.62 75.6 10 4 PVC Sch-40 0.020 45.6-74.7 43-75.6 40-03 0.40 Destroyed 4128/09 <br /> MW-1R 4124&2712009 14.50 58 8 2 PVC Sch.40 0.020 38-58 36-58 3436 0-34 <br /> MW-1 D 4/24&27/2009 14.29 85 15's 2 PVC Sch.40 0.020 70-85 68-85 65-68 0-65 <br /> 8 41MW-2 8!2911995 15.50 75.5 10 4 PVC Sch.40 0.020 55.5-74.5 53-75.5 48-53 0-48 <br /> B-51MW-3 8129/1995 14.53 75 10 4 PVC Sch,40 0.020 55.3-74.3 52.8-75 47.5-52.8 0.47.5 Destroyed 4128/09 <br /> MW-313 4/22/2009 14.54 58 8 2 PVC Sch.40 0.020 38-58 36-58 34-360-34 <br /> B-9/MW-4 10/30/1997 13.83 75 10 4 PVC Sch.40 0.020 45-65 43-65 41-43 0-41 <br /> MW-5 8113/2001 12.76 81 8 2 PVC Sch.40 0.020 60-80 513-80 54-58 0-54 <br /> MW-6 8/13/2001 13.80 81 8 2 PVC Sch.40 0.020 60-80 58-80 55-58 0-55 <br /> MW-7 8/13/2001 13.96 81 8 2 PVC Sch.40 0.020 60-80 58-80 55-58 0-55 <br /> BH-41MW-8 4/16/2004 14.28 1 135 1 8 1 2 1 PVC Sch.40 1 0.024 1 129-134 1 126.134 1 120-126 1 0.5-120 <br /> Vapor Extraction Wells(VW) <br /> M�4 <br /> 8-31VW-1(A) 8/29/1995 14.60 62.6 10 2 PVC Sch.40 0.020 22.2-36.3 21-38 18-21 'Wo'-18 <br /> B-3NW-1(B) 8/29/1995 14.59 62.6 10 2 PVC Sch,40 0.020 42.6-61.6 41-62.6 38-41... ;r��L 0-18 <br /> B-7/VW-2(A) 9f7/1995 14,67 62.2 10 2 PVC Sch.40 0.020 22.1-30 21.38 -18-21 0-18 <br /> B-7NW-2(13) 917/1995 14.89 62.2 10 2 PVC Sch.40 0.020 42.5-61.5 41-62.2 37.7-40.7 0-17 <br /> B-8NW-3(A) 9f7/1995 13.99 61,5 10 2 PVC Sch.40 0.020 22-36 20.8-37.8 17.&20.8 0-16 <br /> B-8NW-3(8) 9!7/1995 13.98 61.5 10 2 PVC Sch.40 0.020 41.8-60.8 40.8-61.3 37.8-00.8 0-16 <br /> BH-1/VW-4 1 4/1312004 1 14.71 1 41 1 10 4 PVC Sch.40 1 0.020 1 25-40 23-40 1 20-23 0-20 <br /> Air Sparge Wells(AW) <br /> 131-1-21AW-1 1 4/13/2004 NA 66 8 2 PVC 0.020 60-65 58-65 55-58 0-55 <br /> Soil Vapor Probe(VP) <br /> VP-1 1125108 - 6 5 114 TT and SS 14 N 5.25-5.75 5-6 3-5 0-3 Destroyed 4121109 <br /> VP-2 1/25/08 - 6 5 114 TT and SS 14 N 5;25-5.75 5-6 3.5 0-3 Destroyed 4121109 <br /> VP-3 1125108 - 6 5 114 TT and SS 14 N5.25-5.75 5-6 3-5 0-3 Destroyed 4121109 <br /> tes7 <br /> bgs=below ground surface TT and SS=Teflon Tubing and Stainless Steel <br /> TOC=top of casing Filter Pack is with#3 sand <br /> PVC=polyvinyl chloride -=Not available <br /> Sch.=Schedule Elevations are in US survey feet <br /> p=micron Borings B-2 and B-6 were drilled in a 45-degree angle <br /> 2186 Soil Boring and-Well Construction Details.As Page 1 of 1 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.