My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:16:31 AM
Creation date
2/15/2019 8:50:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County DIRECTOR <br /> Donna Heran, REHS <br /> Environmental Health Department ASSISTANT DIRECTOR <br /> ~ � <br /> e 600 East Main Street Laurie Cotulla,REHS <br /> y Irrilll` { Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Mike Huggins, RENS,RDI <br /> P Margaret Lagorio,REHS <br /> Cq �� Website: www.sjgov.org/ehd Robert McClellon,REHS <br /> �fFOR <br /> Phone: (209)46$-3420 Jeff Can-uesco,REHS,RD] <br /> Fax: (209)464-0138 Kasey Foley,REHS <br /> February 6,2009 <br /> Mr. Sergio Morescalchi <br /> Atlantic Richfield Company <br /> Post Office Box 1257 <br /> San Ramon, California 94583 <br /> Subject: ARCO Service Station No. 2186 <br /> 3212 North California Street <br /> Stockton, California 94570 <br /> The San Joaquin County Environmental Health Department (EHD) has reviewed Addendum to <br /> IYork Plan for Vapor Probe Destruction, Well Destruction, and Well Installation (Addendum), <br /> dated January 26, 2009, prepared by Stantec Consulting Corporation (Stantec) on your behalf for <br /> the above-referenced site. The Addendum includes revisions for destroying soil vapor probes <br /> VP-1, VP-2, and VP-3, and installing two monitoring wells (MW-1R and MW-3R) screened <br /> across the first groundwater bearing zone, and one monitoring well (MW-1D) screened across a <br /> deep groundwater bearing zone. By letter dated December 3, 2008, the E11D approved the <br /> proposed method for destroying MW-1 and MW-3 and directed the submittal of an addendum to <br /> Nark Plan for Vapor Probe Destruction, Well Destruction, and Well .Installation (Work Plan) <br /> dated October 14, 2008. <br /> The EHD approves the destruction of soil vapor probes VP-1, VP-2, and VP-3 as proposed by <br /> Stantec in the Addendum. The three soil vapor probes will be over-drilled to total depth of <br /> approximately six feet below surface grade (bsg) and the borings will be grouted with neat <br /> cement from total depth to ground surface using a tremie pipe. <br /> The EHD also approves the installation of MW-IR and MW-3R as proposed by Stantec in the <br /> Addendum. The two shallow wells will be advanced to approximately fifty-eight feet bsg using <br /> eight-inch-diameter hollow-stem augers and constructed with a screen between approximately <br /> thirty-eight and fifty-eight feet bsg. Soil will be continuously cored from approximately thirty <br /> feet bsg to total depth for lithological evaluation and soil cores will be screened in the field for the <br /> presence of volatile organic compounds using a photo-ionization detector, Selected soil samples <br /> will be analyzed by an environmental laboratory certified by the State of California. Although <br /> Figure 2 of the Addendum illustrates that the shallow wells will be constructed using four-inch <br /> diameter schedule 40 poly vinyl chloride (PVC) casing, the EHD recommends that the wells be <br /> constructed using two-inch diameter schedule 40 PVC casing, as proposed by Stantec in both the <br /> narrative of the Work Plan dated October 14, 2008, and the narrative of the Addendum dated <br /> January 26, 2009. The EHD also recommends that #3 sand be used with 0.020-inch-slotted <br /> casing instead of the proposed 2112 sand. <br />
The URL can be used to link to this page
Your browser does not support the video tag.