Laserfiche WebLink
i <br /> w <br /> S <br /> ERGIO MORESCALCHI <br /> ATLANTIC RICHFIELD COMPANY <br /> P O BOX 1257 <br /> SAN RAMON CA 94583 <br /> RE: ARCO/BP Sites in San_Joaquin County <br /> A meeting was held on September 13, 2007,at the office of San Joaquin County Environmental <br /> Health Department(EHD). Attending the meeting were you representing ARCO/BP,Rusty <br /> Benkosky and Brian Westhoff representing SECOR,Margaret Lagorio,Nuel C. Henderson,Michael <br /> I Infurna,Lori Duncan, and Vicki McCartney representing EHD. The following is a synopsis of the <br /> status and/or site specific discussions at the meeting. <br /> 2478 E. Oak Street,Stockton, #443 <br /> The report on the installation of the new wells should be submitted to EHD soon. It has been <br /> about three months since the work was completed. <br /> 1612 Hammer Lane,,Stockton.#548 <br /> The off-site property owners have not signed the access agreements for installation of wells on their <br /> property. SECOR will send another request and if there is still no cooperation EHD will request <br /> cooperation once SECOR provides copies of correspondence sent to those property owners. The <br /> City of Stockton is making improvements along Hammer Lane and some of the wells at 1612 <br /> Hammer may need to be destroyed. The EHD will provide more information on this when it <br /> becomes available. <br /> 6100 N. Highway 99 Stockton #595 <br /> Monitoring of the two wells remaining for this site will continue until the California Department of <br /> Transportation has completed construction of the highway interchange. <br /> 7906 N. El Dorado Street Stockton #2130 <br /> New wells have been installed for the site. The on-site vapor well will be scheduled for destruction <br /> soon. <br /> 441 Charter Way. Stockton #2168 <br /> The inlet on the air sparge system melted so the system is not operating. Once the inlet is repaired <br /> the system will resume operation. The soil vapor extraction system is operating. - <br /> 3212 N. California Street Stockton 42186 <br /> The EHD approved the soil vapor extraction rebound plan. A Site Conceptual Model should be <br /> submitted to EHD this week. A response to moving V13-1 will be submitted to EHD in a week. I <br /> i <br /> I <br />