My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
3500 - Local Oversight Program
>
PR0544153
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:16:31 AM
Creation date
2/15/2019 8:50:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544153
PE
3528
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
02
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 3 <br /> For VW-2A and VW 28 grout from : <br /> 61.5 '-22' bsg(screen interval)with 30%bentonite solid grouts, <br /> 22'-18' bsg install blotter sand <br /> 18'-0' bsg 10.3 sack sand/cement mixture <br /> Contact me if you have any questions, <br /> Adrienne <br /> Adrienne Ellseesser, REH5 <br /> Acting Program Coordinator <br /> San Joaquin County <br /> E=nvironmental Health Department <br /> 1868-East Hazelton Avenue <br /> Stockton ; CA 95205 <br /> Ph (209) 468-0343 <br /> Fax (209) 468-0341 <br /> ae I Isaesser@ s jcchd.com <br /> From: Morescalchi, Sergio [mailto:Sergio.Morescalchi@bp.com] <br /> Sent: Friday, June 22, 2012 9:02 AM <br /> To: Adrienne Ellsaesser [EH] <br /> Subject: FW: BP 2186 <br /> Hi Adrienne, <br /> Stantec did some research and it looks like VW-land VW-2 were installed before the larger USTs were <br /> installed at the site(please see below). Also, it has come to my attention that if you do approve the <br /> variance to pressure grout instead of over drill VW-1 and VW-2, we need a variance for the following SJC <br /> Well Standards requirement: "a hole at least one foot larger in diameter than the originally drilled hole <br /> shall be excavated around the outside of the well casing to a depth not less than three feet below the <br /> ground surface." Please call me with any questions. Thanks. <br /> Sergio Morescalchi <br /> Atlantic Richfield Company <br /> Phone 925-275-3807 <br /> Cell 925-487.0940 <br /> sergio.morescalchi@bp.com__ <br /> From: Francini, Catherine [mailto:Catherine.Francini@stantec.com] <br /> Sent: Thursday, June 21, 2012 5:47 PM <br /> To: Morescalchi, Sergio <br /> Cc: Westhoff, Brian <br /> Subject: BP 2186 <br /> Hi Sergio, <br /> 6/28/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.